NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 133 pages

Environmental Community Air Monitoring Plan, 2005

Machine-extracted title · confidence 46%

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

NYC-WTC_000453085–000453217
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - October 21, 2005

Asbestos, Mercury, and PCBs using a Personal Sampling Pump

Maintenance, testing and inspection requirements for the personal sampling pumps are as follows:

• Routine maintenance will be performed according to the manufacturer’s instnictions on the following schedule:

Part Replacement Interval (hours) Valves 2,000 Pump Diaphragm 2,500 Dampener 2,500 Motor 4,500

Note: Replacement intervals may be shorter in dusty conditions.

• Flow Rate Verification - On a weekly basis, the field technician will verify the sampling flow rate on the sampling pump using a rotometer, bubble meter, or other suitable flow measuring device that is NIST traceable. The flow rate should not vary from the set point by more than ±10%. If it does, the flow through the pump must be recalibrated.

Respirable Silica using a Personal Sampling Pump Maintenance, testing, and inspection requirements for the personal sampling pump are as follows:

• Routine maintenance of pump will be performed according to the manufacturer’s instructions on the following schedule:

Part Replacement Interval (hours) Valves 2,000 Pump Diaphragm 2,500 Dampner 2,500 Motor 4,500

Note: Replacement intervals may be shorter in dusty conditions.

• Flow Rate Verification - On a weekly basis, the field technician will verify the sampling flow rate on the sampling pump using a rotometer, bubble meter, or other suitable flow measuring device that is NIST traceable. The flow rate should not vary from the set point by more than ±10%. If it does, the flow through the pump must be recalibrated.

88

CITY_21MC100_003238133

NYC-WTC_000453172

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000453172Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

NYC-WTC_000441133

Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000446145

Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.

Similar indexed content

Compare copies and versions →