NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - February 1, 2006
7.0 PROJECT/TASK DESCRIPTION
This section provides a general overview of the activities that will be performed and how
and when they will be performed. Specific details for individual project activities will be
discussed in later sections of the QAPP.
7.1 Project Overview
Based upon the companion document Part II - Environmental Community Air Monitoring
Program during the Abatement and Demolition of 133-135 Greenwich Street and 21-23
Thames Street, the primary objective of this investigation is to monitor air quality in the
vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the deconstruction
of the building on that property. The plan consists of monitoring of dust in the vicinity of
the deconstruction site on both a real-time or continuous basis. These objectives will be
satisfied by the sampling and analysis program outlined in Sections 7.1.1 and 7.1.2.
Laboratories performing these analyses are summarized in Section 4.3.4 of the
QAPP. There are multiple aspects and levels to the overall air monitoring program
proposed for the deconstruction of 133-135 Greenwich Street and 21-23 Thames Street.
The following is a brief summary of the three (3) components or levels of air monitoring
proposed for the project:
• “Level 1”: The Contractors performing aspects of Abatement Phase
deconstruction work (largely interior, non-structural efforts) will be responsible
for collecting air samples on their personnel directly performing various work
activities to determine airborne levels of contaminants potentially generated by
the work at the source as required by OSHA.
• “Level 2”: The next layer of sampling is for NYC Title 15, Chapter 1 compliance.
NYC Title 15, Chapter 1-required sampling will entail sampling the ambient air
inside the building during Abatement Phase work outside of work areas, at the
personnel and waste load out decontamination stations and other locations.
In addition, samples will be collected, as required, outside the building within ten
(10) feet of the negative pressure ventilation exhaust. “Level 3”: Beyond that,
there will be continuous monitoring of the exterior ambient air within the site
boundaries and at specific elevated locations, as described in the Part 11 -
Environmental Community Air Monitoring Plan During Abatement and
Demolition of 133-135 Greenwich Street and 21-23 Thames Street. This QAPP
further defines the technical approach and provides the anticipated schedule of
activities for the “Level 3” air monitoring.
7.1.1 Sampling Tasks Sampling phases will consist of the following segments:
Background, Abatement Phase and Demolition Phase. General descriptions of the work
included in each phase are presented in Pari II - Environmental Community Air
Monitoring Program during theAbatement and Demolition of 133-135 Greenwich Street
27
CITY_21MC100_003239880
NYC-WTC_000446648