NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Chain of custody, Greenwich/Thames Air Monitoring Plan

Machine-extracted title · confidence 50%

Title/approval sheet for Environmental Community Air Monitoring Program and Greenwich/Thames Plan.

NYC-WTC_000448085–000448218
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - January 27, 2006

7.0 PROJECT/TASK DESCRIPTION

This section provides a general overview of the activities that will be performed and how and when they will be performed. Specific details for individual project activities will be discussed in later sections of the QAPP.

7.1 Project Overview

Based upon the companion document Part II - Environmental Community Air Monitoring Program during the Abatement and Demolition of 133-135 Greenwich Street and 21-23 Thames Street, the primary objective of this investigation is to monitor air quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the deconstruction of the building on that property. The plan consists of monitoring of dust in the vicinity of the deconstruction site on both a real-time or continuous basis. These objectives will be satisfied by the sampling and analysis program outlined in Sections 7.1.1 and 7.1.2. Laboratories performing these analyses are summarized in Section 4.3.4 of the QAPP. There are multiple aspects and levels to the overall air monitoring program proposed for the deconstruction of 133-135 Greenwich Street and 21-23 Thames Street. The following is a brief summary of the three (3) components or levels of air monitoring proposed for the project:

• “Level 1”: The Contractors performing aspects of Abatement Phase deconstruction work (largely interior, non-structural efforts) will be responsible for collecting air samples on their personnel directly performing various work activities to determine airborne levels of contaminants potentially generated by the work at the source as required by OSHA. • “Level 2”: The next layer of sampling is for NYC Title 15, Chapter 1 compliance. NYC Title 15, Chapter 1-required sampling will entail sampling the ambient air inside the building during Abatement Phase work outside of work areas, at the personnel and waste load out decontamination stations and other locations. In addition, samples will be collected, as required, outside the building within ten (10) feet of the negative pressure ventilation exhaust. “Level 3”: Beyond that, there will be continuous monitoring of the exterior ambient air within the site boundaries and at specific elevated locations, as described in the Part 11 - Environmental Community Air Monitoring Plan During Abatement and Demolition of 133-135 Greenwich Street and 21-23 Thames Street. This QAPP further defines the technical approach and provides the anticipated schedule of activities for the “Level 3” air monitoring.

7.1.1 Sampling Tasks Sampling phases will consist of the following segments: Background, Abatement Phase and Demolition Phase. General descriptions of the work included in each phase are presented in Pari II - Environmental Community Air Monitoring Program during theAbatement and Demolition of 133-135 Greenwich Street

27

CITY_21MC100_011979767

NYC-WTC_000448111

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448111Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446145

Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.

Similar indexed content

NYC-WTC_000446622

Part V plan for Environmental Community Air Monitoring at Greenwich/Thames sites.

Similar indexed content

NYC-WTC_000453085

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

Similar indexed content

NYC-WTC_000441133

Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.

Similar indexed content

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

Compare copies and versions →