NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Environmental Community Air Monitoring Plan, Greenwich/Thames

Machine-extracted title · confidence 31%

Part V plan for Environmental Community Air Monitoring at Greenwich/Thames sites.

NYC-WTC_000446622–000446755
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - Rev 1 - February 1, 2006

September, 2005 and amended the draft deconstruction plan documents.

6.2 Project Purpose and Objectives

The principal purpose of the air monitoring program, as described in The document entitled Part 11 - Environmental Community Air Monitoring Plan During Abatement and Demolition of 133-135 Greenwich Street and 21-23 Thames Street, is to monitor air quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the deconstruction of the building on that property. The plan consists of monitoring of dust in the vicinity of the deconstruction site on both a real-time or continuous basis as well as a time-weighted or integrated basis. Principal objectives of the program are as follows: • Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that dust associated with the building deconstruction are maintained below target and trigger action levels. • In the event that dust levels exceed target and trigger action levels, building deconstruction management personnel will be immediately notified so that all necessary corrective actions can be taken. • Monitor PM 10 and PM2.5 on a time-weighted or 24-hour average basis to provide assurances that levels of respirable particulate matter associated with the deconstruction are below the 24 hour National Ambient Air Quality Standards (NAAQS) of 150 ug/m3 and 65 ug/ms, respectively. • Collect particulate matter on a time-weighted or integrated basis such that samples are available for monitoring of target compounds potentially associated with World Trade Center dust (e.g., asbestos, lead). • Compare measured concentrations of project target parameters to action levels established on a compound-specific basis. In the event that measured concentrations exceed any project specific action level for one or more of these target compounds, appropriate corrective actions immediately will be taken. A project timeline is provided as Figure 6-2. • Collect waste stream samples for RCRA analyses in support of the Waste Management Plan (WMP) to characterize, manage, containerize, and legally transport and dispose of waste streams that will be generated as part of the 133- 135 Greenwich Street/21-23 Thames Street Deconstruction Project.

6.3 Project Action Levels

A two-tiered system will be in place during the entire term of the deconstruction project. This system includes use of both Target Air Quality Levels and USEPA Site Specific Trigger Levels for each of the target parameters. A summary listing of the Action Levels provided on a parameter-specific basis is shown in Table 6-3.

6.3.1 Decisions Based on Project Action Levels The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated

21

CITY_21MC100_003239874

NYC-WTC_000446642

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000446642Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446145

Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.

Similar indexed content

NYC-WTC_000448085

Title/approval sheet for Environmental Community Air Monitoring Program and Greenwich/Thames Plan.

Similar indexed content

NYC-WTC_000453085

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

Similar indexed content

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →