Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - January 27, 2006
September, 2005 and amended the draft deconstruction plan documents.
6.2 Project Purpose and Objectives
The principal purpose of the air monitoring program, as described in The document
entitled Part 11 - Environmental Community Air Monitoring Plan During Abatement and
Demolition of 133-135 Greenwich Street and 21-23 Thames Street, is to monitor air
quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the
deconstruction of the building on that property. The plan consists of monitoring of dust in
the vicinity of the deconstruction site on both a real-time or continuous basis as well as a
time-weighted or integrated basis. Principal objectives of the program are as follows:
• Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that dust
associated with the building deconstruction are maintained below target and
trigger action levels.
• In the event that dust levels exceed target and trigger action levels, building
deconstruction management personnel will be immediately notified so that all
necessary corrective actions can be taken.
• Monitor PM 10 and PM2.5 on a time-weighted or 24-hour average basis to provide
assurances that levels of respirable particulate matter associated with the
deconstruction are below the 24 hour National Ambient Air Quality Standards
(NAAQS) of 150 ug/m3 and 65 ug/ms, respectively.
• Collect particulate matter on a time-weighted or integrated basis such that
samples are available for monitoring of target compounds potentially associated
with World Trade Center dust (e.g., asbestos, lead).
• Compare measured concentrations of project target parameters to action levels
established on a compound-specific basis. In the event that measured
concentrations exceed any project specific action level for one or more of these
target compounds, appropriate corrective actions immediately will be taken. A
project timeline is provided as Figure 6-2.
• Collect waste stream samples for RCRA analyses in support of the Waste
Management Plan (WMP) to characterize, manage, containerize, and legally
transport and dispose of waste streams that will be generated as part of the 133-
135 Greenwich Street/21-23 Thames Street Deconstruction Project.
6.3 Project Action Levels
A two-tiered system will be in place during the entire term of the deconstruction project.
This system includes use of both Target Air Quality Levels and USEPA Site Specific
Trigger Levels for each of the target parameters. A summary listing of the Action Levels
provided on a parameter-specific basis is shown in Table 6-3.
6.3.1 Decisions Based on Project Action Levels The following actions will be taken if
there is an exceedance of any Target Air Quality Level. If there is an exceedance of both
the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated
21