NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

Asbestos, NY DOL reference

Machine-extracted title · confidence 38%

Asbestos standards reference page from NY Department of Labor materials.

NYC-WTC_000441450–000441560
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TABLE OF CONTENTS

SUBPART 56-1 GENERAL PROVISIONS 4 56-1.1 Title and Citation..................................................................... 4 56-1.2 Purpose and Intent of Part...................................................... 4 56-1.3 Application.............................................................................. 4 56-1.4 Responsibility of General Contractor or Construction Manager. 5 56-1.5 Responsibility for Cleanup of Uncontrolled Disturbance.......... 5 56-1.6 Other Codes............................................................................ 5 SUBPART 56-2 DEFINITIONS....... 6 56-2.1 Terms.................................. 6 Table 1 ..................................... 8 SUBPART 56-3 ADMINISTRATIVE 19 56-3.1 Licensing Requirements and Procedures........................................................................ 19 56-3.2 Certification Requirements and Procedures.................................................................... 21 56-3.3 Replacement of Licenses and Certificates...................................................................... 26 56-3.4 Notice and Record-keeping Requirements...................................................................... 27 56-3.5 Emergency Asbestos Project Notification........................................................................ 32 56-3.6 Notification of Residential and Business Occupants........................................................ 32 SUBPART 56-4 GENERAL PROJECT AIR SAMPLING & LAB ANALYSIS REQUIREMENTS 35 56-4.1 Qualifications of Air Sampling Personnel......................................................................... 35 56-4.2 Laboratory Certification................................................................................................... 35 56-4.3 Independent Third Party Sampling and Analysis............................................................. 35 56-4.4 Asbestos Contractors Allowed to Perform Project Air Sampling on an Asbestos Project.. 35 56-4.5 Air Sample Log............................................................................................................... 35 56-4.6 Test Methods.................................................................................................................. 36 56-4.7 Air Sampling Equipment.................................................................................................. 36 56-4.8 Area Air Sample Analysis and Results - General Requirements..................................... 37 56-4.9 Number and Location of Samples Required................................................................... 38 56-4.10 Work Stoppage Criteria During Phase II A through II C................................................. 38 56-4.11 Phase II C Satisfactory Clearance Air Sample Results Criteria..................................... 38 56-4.12 Unsatisfactory Clearance Air Sample Results............................................................... 39 Table 2............................................................................................................................................. 40 SUBPART 56-5 PHASE lA: ASBESTOS SURVEY PLANNING AND DESIGN 41 56-5.1 Asbestos Survey Requirements............................................................. 41 SUBPART 56-6 PHASE 1B: BACKGROUND AIR SAMPLING........ 47 56-6.1 General Requirements............................................................................ 47 56-6.2 Number and Location of Background Air Samples.................................. 47 56-6.3 Establishment of Background Level........................................................ 47 SUBPART 56-7 PHASE II A WORK AREA PREPARATION........................... 48 56-7.1 Air Sampling Requirements............................................... 48 56-7.2 Materials and Equipment................................................... 49 56-7.3 Asbestos Abatement Contractor Daily Project Log............ 50 56-7.4 Establishing Each Regulated Abatement Work Area......... 51 56-7.5 Personal and Waste Decontamination System Enclosures 52 (a) Installation........................................................................ 52

12 NYCRR56 Page 1

CITY_21MC100_003240863

NYC-WTC_000441451

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441451Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →