NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Asbestos Part 56, NYC-WTC

Machine-extracted title · confidence 41%

New York City Part 56 asbestos documentation, NYC-WTC.

NYC-WTC_000448811–000448923
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TABLE OF CONTENTS

SUBPART 56-1 GENERAL PROVISIONS 4 56-1.1 Title and Citation........................................................... 4 56-1.2 Purpose and Intent of Part............................................. 4 56-1.3 Application..................................................................... 4 56-1.4 Multi-employer Worksites.............................................. 5 56-1.5 Responsibility for Cleanup of Uncontrolled Disturbance. 6 56-1.6 Other Codes.................................................................. 6 SUBPART 56-2 DEFINITIONS 7 56-2.1 Terms 7 Table 1 ... 9 SUBPART 56-3 ADMINISTRATIVE 20 56-3.1 Licensing Requirements and Procedures........................................................................ 20 56-3.2 Certification Requirements and Procedures.................................................................... 22 56-3.3 Replacement of Licenses and Certificates....................................................................... 27 56-3.4 Notice and Record-keeping Requirements...................................................................... 27 56-3.5 Emergency Asbestos Project Notification........................................................................ 32 56-3.6 Notification of Residential and Business Occupants........................................................ 33 SUBPART 56-4 GENERAL PROJECT AIR SAMPLING & LAB ANALYSIS REQUIREMENTS 35 56-4.1 Qualifications of Air Sampling Personnel........................................................................ 35 56-4.2 Laboratory Certification................................................................................................. 35 56-4.3 Independent Third Party Sampling and Analysis............................................................ 35 56-4.4 Asbestos Contractors Allowed to Perform Project Air Sampling on an Asbestos Project. 35 56-4.5 Air Sample Log.............................................................................................................. 35 56-4.6 Test Methods................................................................................................................. 36 56-4.7 Air Sampling Equipment................................................................................................ 36 56-4.8 Area Air Sample Analysis and Results - General Requirements................................... 37 56-4.9 Number and Location of Samples Required.................................................................. 38 56-4.10 Work Stoppage Criteria During Phase II A through II C................................................ 38 56-4.11 Phase II C Satisfactory Clearance Air Sample Results Criteria.................................... 38 56-4.12 Unsatisfactory Clearance Air Sample Results.............................................................. 39 Table 2............................................................................................................................... 40 SUBPART 56-5 PHASE lA: ASBESTOS SURVEY PLANNING AND DESIGN 41 56-5.1 Asbestos Survey Requirements...................................... 41 SUBPART 56-6 PHASE 1B: BACKGROUND AIR SAMPLING 47 56-6.1 General Requirements.............................................. 47 56-6.2 Number and Location of Background Air Samples..... 47 56-6.3 Establishment of Background Level........................... 47 SUBPART 56-7 PHASE II A WORK AREA PREPARATION 48 56-7.1 Air Sampling Requirements..................................... 48 56-7.2 Materials and Equipment......................................... 49 56-7.3 Asbestos Abatement Contractor Daily Project Log... 50 56-7.4 Establishing Each Regulated Abatement Work Area. 51

12 NYCRR56 Page 1

CITY_21MC100_004988460

NYC-WTC_000448812

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000448812Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →