NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

NYC-WTC_000233286

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000233286–000233396
Page image
Scanned page image, NYC-WTC_000233287
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TABLE OF CONTENTS

SUBPART 56-1 GENERAL PROVISIONS 4 56-1.1 Title and Citation..................................................................... 4 56-1.2 Purpose and Intent of Part...................................................... 4 56-1.3 Application.............................................................................. 4 56-1.4 Responsibility of General Contractor or Construction Manager. 5 56-1.5 Responsibility for Cleanup of Uncontrolled Disturbance.......... 5 56-1.6 Other Codes............................................................................ 5 SUBPART 56-2 DEFINITIONS....... 6 56-2.1 Terms.................................. 6 Table 1 ..................................... 8 SUBPART 56-3 ADMINISTRATIVE 19 56-3.1 Licensing Requirements and Procedures........................................................................ 19 56-3.2 Certification Requirements and Procedures.................................................................... 21 56-3.3 Replacement of Licenses and Certificates...................................................................... 26 56-3.4 Notice and Record-keeping Requirements...................................................................... 27 56-3.5 Emergency Asbestos Project Notification........................................................................ 32 56-3.6 Notification of Residential and Business Occupants........................................................ 32 SUBPART 56-4 GENERAL PROJECT AIR SAMPLING & LAB ANALYSIS REQUIREMENTS 35 56-4.1 Qualifications of Air Sampling Personnel......................................................................... 35 56-4.2 Laboratory Certification................................................................................................... 35 56-4.3 Independent Third Party Sampling and Analysis............................................................. 35 56-4.4 Asbestos Contractors Allowed to Perform Project Air Sampling on an Asbestos Project.. 35 56-4.5 Air Sample Log............................................................................................................... 35 56-4.6 Test Methods.................................................................................................................. 36 56-4.7 Air Sampling Equipment.................................................................................................. 36 56-4.8 Area Air Sample Analysis and Results - General Requirements..................................... 37 56-4.9 Number and Location of Samples Required................................................................... 38 56-4.10 Work Stoppage Criteria During Phase II A through II C................................................. 38 56-4.11 Phase II C Satisfactory Clearance Air Sample Results Criteria..................................... 38 56-4.12 Unsatisfactory Clearance Air Sample Results............................................................... 39 Table 2................................................................................................................................ 40 SUBPART 56-5 PHASE lA: ASBESTOS SURVEY PLANNING AND DESIGN 41 56-5.1 Asbestos Survey Requirements............................................................. 41 SUBPART 56-6 PHASE 1B: BACKGROUND AIR SAMPLING........ 47 56-6.1 General Requirements............................................................................ 47 56-6.2 Number and Location of Background Air Samples.................................. 47 56-6.3 Establishment of Background Level........................................................ 47 SUBPART 56-7 PHASE II A WORK AREA PREPARATION........................... 48 56-7.1 Air Sampling Requirements............................................... 48 56-7.2 Materials and Equipment................................................... 49 56-7.3 Asbestos Abatement Contractor Daily Project Log............ 50 56-7.4 Establishing Each Regulated Abatement Work Area......... 51 56-7.5 Personal and Waste Decontamination System Enclosures 52 (a) Installation........................................................................ 52

12 NYCRR56 Page 1

CITY_21MC100_0 03235021

NYC-WTC_000233287

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000233287Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →