NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

NYC-WTC_000233286

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000233286–000233396
Page image
Scanned page image, NYC-WTC_000233288
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(b) Personal Decontamination System Enclosure - Large Project............................ 52 (c) Personal Decontamination System Enclosure - Small Project.............................. 54 (d) Remote Personal Decontamination System Enclosure........................................ 54 (e) Waste Decontamination System Enclosure - Large & Small Projects.................. 56 (f) Waste Decontamination System Enclosure - When Remote Personal Is Allowed. 57 Figure 1..................................................................................................................... 58 Figure 2..................................................................................................................... 58 Figure 3..................................................................................................................... 59 Figure 4..................................................................................................................... 59 56-7.6 Personal Protection Equipment (PPE).................................................................. 60 56-7.7 Electric Power...................................................................................................... 60 56-7.8 Engineering Controls............................................................................................ 61 56-7.9 Heating, Ventilation, and Air Conditioning (HVAC) Systems................................ 64 56-7.10 Regulated Abatement Work Area Pre-Cleaning.................................................. 65 56-7.11 Regulated Abatement Work Area Enclosure...................................................... 66 (a) Critical Barriers.................................................................................................... 66 (b) Isolation Barriers.................................................................................................. 66 (c) Removal of Mounted Objects............................................................................... 67 (d) Elevator Shutdown or Isolation............................................................................ 67 (e) Floor, Wall & Ceiling Plasticizing and Sealing...................................................... 67 (f) Barrier/Plasticizing Exemptions............................................................................. 67 (1) Negative Pressure Tent Regulated Abatement Work Area Enclosure 67 (2) Fire-Retardant Spray Plastic............................................................. 69 (3) Special Projects................................................................................ 69 (4) Removal of Ceilings and Components.............................................. 69 (5) Exits.................................................................................................. 70 (g) Toilet Facilities..................................................................................................... 70 SUBPART 56-8 PHASE II B ASBESTOS ABATEMENT................................................ 71 56-8.1 Air Sampling Requirements.................................................................................. 71 56-8.2 Access to & Maintenance of Decon. Systems & Regulated Abatement Work Area Enclosures. ..71 56-8.3 Regulated Abatement Work Area Entry and Exit Procedures.................................. 74 56-8.4 Handling and Removal Procedures......................................................................... 76 56-8.5 Waste Clean-Up Procedures................................................................................... 78 56-8.6 Multiple Removals within a Single Regulated Abatement Work Area...................... 78 56-8.7 Encapsulation Procedures....................................................................................... 81 56-8.8 Asbestos Material Encasement/Enclosure Procedures........................................... 82 56-8.9 Equipment and Waste Container Decontamination and Removal Procedures......... 83 SUBPART 56-9 PHASE II C FINAL CLEANING AND CLEARANCE PROCEDURES...... 86 56-9.1 Final Cleaning Procedures...................................................................................... 86 56-9.2 Air Sampling Requirements..................................................................................... 88 (a) Personal Air Sampling............................................................................................ 88 (b) Daily Air Sampling.................................................................................................. 88 (c) Exemption From Daily Air Sampling........................................................................ 88 (d) Clearance Air Sampling.......................................................................................... 88 (e) Exemption From Clearance Air Sampling............................................................... 90 (f) Satisfactory Clearance Air Sample Results.............................................................. 90 (g) Unsatisfactory Clearance Air Sample Results......................................................... 90 56-9.3 Dismantling of Regulated Abatement Work Area..................................................... 91 SUBPART 56-10 PHASE II D FINAL WASTE REMOVAL FROM SITE REQUIREMENTS, 93 56-10.1 Air Sampling Requirements................................................................................... 93 (a) Satisfactory Clearance Air Results.......................................................................... 93 56-10.2 Removal of Tools and Equipment.......................................................................... 93 56-10.3 Removal of Remote Decontamination Enclosure................................................... 93

12 NYCRR56 Page 2

CITY_21MC100_0 03235022

NYC-WTC_000233288

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000233288Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →