NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 56 pages

Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.

NYC-WTC_000125698–000125753

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125727
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 01/17/2005 01:42 17325653654 NOVA DEVELOPMENT GRP PAGE 10

• NC Dom.' Aabemtoe Control Program YAR

A'ahemom R

R81SOT8 1goI ,id1D WMTE AfCORT1t zON V 8

APPLISS 'PO VAxIMCE 1ftO s TTTLR 19, CBftPTRt ..1, RULSS or T> CXTY OF NEW YOBS SSCTIOWO 1-12(e) and 1-59 (a) l (15 RCW l 1-82(a) AM 8 1'-83 (a•)}.

1. The worker deeontam3.natioa unit ,shall be conatrueted outside the work area'in accordance with 15 RlYY 3 1-82, and attached to individua), glovebag work areas (or tents) or common space leading to individual work areas.

2. The remote worker decontamination unit .shall consist of, at least, a shower roam, and a clean room separated from each other by an airlock and from the glovebag wor4c area.

3. The remote waste decontamination wait. ®hall be constructed in accordance with 15 Rt~1 s 1-83, located outmidee the glovebag work area on the same- floor.

4. The decontamination units shall be. maintained in accordance with 15 Rau[ 11-94 (except stub-section b). .

5. All asbestos handlers shall wear two disposable suits, inolud.4ng gloves, hood and footwear, and appropriate reepAratory equipment, after removing street, clothes in the clean -room.

a. After+ the ACME removal and bagging {refer 19 ROMt ® i-10s-(e) is), the bagged waste aba 2 be B3PZ-1,mcuwned then wet cleaned and transferred outside the glovebag work area (or' tent) for double: bagging, and then Moved to the wash room for wet washing, followed by storage in the holding area, before loading far transportation,

7. Each worker, before leaving the glovebag .work arm (or tent) , ' shall olean the outside of the respirators and cuter protecting clothing by wet: cleaning end/or =VA vacuuming. The outer disposable suit shall be. removed' in the work area an the • workers shall theca proceed to the Shower room. The Lunar disposable suit and respirator shall be washed thoroughly before reeooving and prior to aggressive shower.

a. The decontamination units shall be in place for the entire duration of the ebateerteaq activities. .

®. The following additional conditions must be complied with in order to re-use the attached decontamination enclosure systems as remote decontamination wdita.

i) Final air clearance must be habiieved.in•the full cent2imment area to which the • decontarinetion enclosure syotems axe attached. i i) The deaoflra n9.awtion enclosure systems shall be xe-plasticized in accordan with 15 RQI)tid 1-82 and S 1-a3.

SOT&e This attachment is •being reviewed fbr future revision. Taff/M 6/ 98

NYC-WTC 000125727

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125727Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →