VAR#
NYC DEP ASBESTOS CONTROL i+ROGR3M ATTACgxCxT D
REMOTE WORD& DECONTAMINATION UNIT
RULES TEE TY OF
APPLIES TO vxl%
NCE FROM TITZ-8 3.5,
RUP (a), 8Z OF
CI
NEW YORK SECTIONS 1-82(a) AND 3.-83(a) {
outside the work area, in
decontamination unit shall be constructed
1, The remote worker areas (or tents)
attached to individual glovebag work
accordance with 15 RCNY 5 1-82, and
individual work areas.
or common space leading to
kraoom...and a
a shower
unit shall consist of, at least,
2. The remote worker decontamination
clean room separated from each other by an airlock and from the glovebag
flexible hose for
shower room shall be provided with a
3. In addition to the shower heads, the
equipment and waste decontamination.
with Title 16,
asbestos containing waste shall comply
4. -The remote holding area for the
(16RCNY 8 Er SEQ.)
Chapter 8, Rules of the City of New York
(except sub-
maintained in accordance with 15 RCNY 5 1-94
. The decontamination unit shall be
section b).
footwear,
disposable su3.ts, including gloves• hood and
• All asbestos handlers shall wear two street clothes in the. clean room.
after removing
and appropriate respiratory equipment,
shall be
15 RCNY S 1-105(c)3.5}, the bagged waste
7. After the ACM removal and bagging {refer glovebag work area (or tent) for
outside the
HEPA-vacuumed then wet cleaned and transferred
double bagging, storage and disposal.
of the
work area (or tent), shall clean the outside
6. Each worker, before leaving the glovebag The outer
cleaning and/or HEPA vacuuming.
respirators and outer protecting clothing by wet shall then proceed tofthe
the workers
disposable suit shall be removed in the work area and be
room. The inner disposable and respirator shall be washed thoroughly
suit
removing and prior to aggressive shower.
abatement
for - the entire duration of the
9. 'The decontamination system shall be in place
activities.
attached
complied with in order to re-use an
10. The following additional conditions must be
decontamination unit.
decontamination enclosure system(s) as a remote
the full containment area to which the
I) Final air clearance must be achieved in
decontamination enclosure system(s) is attached.
with
shall be re-plasticized in accordance
ii) The decontamination enclosure system(s)
15 RCNY S 1-82.
lineax feet.
*Required for projects disturbing 1,000 or more
time by the Department.
NOTE: This attachment may be revised at any TRV/JM 6/98