NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 321 pages

Asbestos and lead survey report cover, 130 Cedar Street, July

Machine-extracted title · confidence 100%

Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.

NYC-WTC_000125204–000125524

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125205
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TABLE OF CONTENTS •

Page No. SECTION I- INTRODUCTION:

1.1 RECORD OF CERTIFICATION..................................................................... 2 1.2 INTRODUCTION ........................................................................................... 3 1.3 QUALITY CONTROL PROCEDURES........................................................... 3 1.4 STATEMENT OF MANAGEMENT POLICY .................................................. 4 1.5 AREAS NOT ACCESSIBLE........................................................................... 4

SECTION 2- ASBESTOS SURVEY REPORT

2.1 ASBESTOS INSPECTION AND BULK SAMPLING PROCEDURES ............ 6 2.2 ASBESTOS BULK SAMPLE ANALYSIS AND METHODOLOGY.................. 7 2.3 SCOPE OF WORK FOR ACM....................................................................... 8 2.4 SUMMARY OF FINDINGS FOR ACM .........................................................10 2.5 RECOMMENDATIONS FOR ACM ..............................................................11 2.6 SCHEDULE OF JLC'S INSPECTION RESULTS FOR ACM .......................12 2.7 ASBESTOS QUANTITY SCHEDULE .......................................................... 27

SECTION 3- LEAD PAINT SURVEY REPORT:

3.1 LEAD PAINT INSPECTION & XRF TESTING PROCEDURES ................... 36 3.2 SCOPE OF WORK FOR LBP ...................................................................... 37 3.3 SUMMARY OF FINDINGS FOR LBP .......................................................... 38 3.4 RECOMMENDATIONS FOR LBP ............................................................... 39 3.5 LEAD BASED PAINT QUANTITY SCHEDULE ........................................... 39

APPENDICES:

APPENDIX A: ASBESTOS ANALYTICAL REPORTS:

ASBESTOS CERTIFICATES OF ANALYSIS BY PLM METHOD ASBESTOS CERTIFICATES OF ANALYSIS BY TEM METHOD

APPENDIX B: XRF TESTING RESULTS

APPENDIX C: LAB AND PERSONNEL CERTIFICATION

APPENDIX D: ASBESTOS SAMPLE LOCATION PLANS

APPENDIX E: LEAD BASED PAINT SAMPLE LOCATION PLANS

APPENDIX F: WINDOW & SPANDREL QUANTITY SPREADSHEET 0

NYC-WTC 000125205

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125205Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →