NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 111 pages

Asbestos, NY DOL reference

Machine-extracted title · confidence 38%

Asbestos standards reference page from NY Department of Labor materials.

NYC-WTC_000441450–000441560
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(b) Personal Decontamination System Enclosure - Large Project............................ 52 (c) Personal Decontamination System Enclosure - Small Project.............................. 54 (d) Remote Personal Decontamination System Enclosure........................................ 54 (e) Waste Decontamination System Enclosure - Large & Small Projects.................. 56 (f) Waste Decontamination System Enclosure - When Remote Personal Is Allowed. 57 Figure 1..................................................................................................................... 58 Figure 2..................................................................................................................... 58 Figure 3..................................................................................................................... 59 Figure 4..................................................................................................................... 59 56-7.6 Personal Protection Equipment (PPE).................................................................. 60 56-7.7 Electric Power...................................................................................................... 60 56-7.8 Engineering Controls............................................................................................ 61 56-7.9 Heating, Ventilation, and Air Conditioning (HVAC) Systems................................ 64 56-7.10 Regulated Abatement Work Area Pre-Cleaning.................................................. 65 56-7.11 Regulated Abatement Work Area Enclosure...................................................... 66 (a) Critical Barriers.................................................................................................... 66 (b) Isolation Barriers.................................................................................................. 66 (c) Removal of Mounted Objects............................................................................... 67 (d) Elevator Shutdown or Isolation............................................................................ 67 (e) Floor, Wall & Ceiling Plasticizing and Sealing...................................................... 67 (f) Barrier/Plasticizing Exemptions............................................................................. 67 (1) Negative Pressure Tent Regulated Abatement Work Area Enclosure 67 (2) Fire-Retardant Spray Plastic............................................................. 69 (3) Special Projects................................................................................ 69 (4) Removal of Ceilings and Components.............................................. 69 (5) Exits.................................................................................................. 70 (g) Toilet Facilities..................................................................................................... 70 SUBPART 56-8 PHASE II B ASBESTOS ABATEMENT................................................ 71 56-8.1 Air Sampling Requirements.................................................................................. 71 56-8.2 Access to & Maintenance of Decon. Systems & Regulated Abatement Work Area Enclosures. ..71 56-8.3 Regulated Abatement Work Area Entry and Exit Procedures.................................. 74 56-8.4 Handling and Removal Procedures......................................................................... 76 56-8.5 Waste Clean-Up Procedures................................................................................... 78 56-8.6 Multiple Removals within a Single Regulated Abatement Work Area...................... 78 56-8.7 Encapsulation Procedures....................................................................................... 81 56-8.8 Asbestos Material Encasement/Enclosure Procedures........................................... 82 56-8.9 Equipment and Waste Container Decontamination and Removal Procedures......... 83 SUBPART 56-9 PHASE II C FINAL CLEANING AND CLEARANCE PROCEDURES...... 86 56-9.1 Final Cleaning Procedures...................................................................................... 86 56-9.2 Air Sampling Requirements..................................................................................... 88 (a) Personal Air Sampling............................................................................................ 88 (b) Daily Air Sampling.................................................................................................. 88 (c) Exemption From Daily Air Sampling........................................................................ 88 (d) Clearance Air Sampling.......................................................................................... 88 (e) Exemption From Clearance Air Sampling............................................................... 90 (f) Satisfactory Clearance Air Sample Results.............................................................. 90 (g) Unsatisfactory Clearance Air Sample Results......................................................... 90 56-9.3 Dismantling of Regulated Abatement Work Area..................................................... 91 SUBPART 56-10 PHASE II D FINAL WASTE REMOVAL FROM SITE REQUIREMENTS, 93 56-10.1 Air Sampling Requirements................................................................................... 93 (a) Satisfactory Clearance Air Results.......................................................................... 93 56-10.2 Removal of Tools and Equipment.......................................................................... 93 56-10.3 Removal of Remote Decontamination Enclosure................................................... 93

12 NYCRR56 Page 2

CITY_21MC100_003240864

NYC-WTC_000441452

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441452Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Asbestos sampling chain of custody form

NYC-WTC_000233286

Chain of custody form for asbestos samples referencing New York State Department of Labor regulations and sample tracking details.

Similar indexed content

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →