NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 68 pages

WTC environmental plan, EPA review, 2005

Machine-extracted title · confidence 46%

EPA-compiled plan for Environmental Community Air Monitoring Program, 2005.

NYC-WTC_000437748–000437815
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

revision number (e.g. 1,2,3....) are added after the document type. After the document type and revisiori^amendment code (if any), a six-digit code based on the month, day and year (mmddyy) is added to indicate the date the document was delivered to the client.

Field sampling data will initially be recorded on field data sheets and in field notebooks. Samples will be identified by the field assigned sample number. Paper versions of all deliverables (Work Plan, Generic QAPP and Final Reports) will be provided to the ERT WAM and stored in the REAC Central Files. Electronic versions of ail deliverables will be saved on the REAC archive drive in accordance with Administrative Procedures (AP) #34, Archiving Electronic Eiles. All data deliverables for this WA will be posted to the ERT-Information Management System (IMS) web site as either a Scribe* electronic data deliverable (EDD) or in portable document format (.pfd). Submission of the deliverable to the appropriate ERT-IMS website will be considered delivery to the WAM as of the date and time such deliverables are received on the website.

Field log books will also be archived once the project is completed and the Work Assignment 0-089 is closed. All SOPs referenced in this QAPP are available on the REAC LAN.

C. ASSESSMENT/OVERSIGHT

Cl. ASSESSMENT AND RESPONSE ACTIONS

The REAC TL, Air Response Section Leader, QAO and QC Coordinator are responsible for QC assessments and corrective action for this WA. These personnel have the authority to issue stop work orders. The tasks associated with this QAPP are assessed through the use of peer reviews, technical reviews and/or technical system audits, and management system reviews. Peer review enables the reviewers to identify and correct reporting errors before reports are submitted. Technical reviews are conducted by those immediately responsible for overseeing or performing the work (self-assessments). An independent assessment or technical audit will be performed by Jeff Catanzarita. Management system reviews establish compliance with prevailing management structure, policies and procedures, and ensures that the required data are obtained.

Peer reviews are conducted on project deliverables to ensure a technical review with respect to content, completeness and the overall quality of the deliverable prior to submittal to the EPA/ERT. The responsibilities of the review team and the sequence in which the deliverable is reviewed, is outlined in REAC AP #22, Peer Review of REAC Deliverable*. The REAC QAO will audit data deliverables on a biannual basis to determine compliance with the peer review procedures.

The EPA/ERT WAM for this task will be present and will have the responsibility for verifying that the proper SOPs and sampling procedures are followed. If any technical issues or deficiencies are identified, they will be reported to the REAC TL for immediate resolution or corrective action. Any changes in scope of work will be documented on a Field Change Form and approved by the WAM.

C2. REPORTS TO MANAGEMENT

Monthly technical reports will be prepared for this WA when hours have been charged on a monthly basis. These reports will detail the accomplishments for the past month, any problems encountered, solutions to rectify the problem, contacts and meetings, goals for the next month, and an estimate of the of the total labor hours and costs for the next reporting period. The monthly technical reports are submitted to the EPA7ERT Project Officer and WAM.

On a quarterly basis, the REAC QAO provides a report to the REAC Program manager and the ERT QA Manager that summarizes the quality assurance (QA) activities on a quarterly period. These reports include results of performance evaluation samples, system audits (internal and external), summary of non-conformance and corrective actions, preparation of SOPs for analytical and operational activities, training, contacts/meetings and other QA activities.

30

CITY_21MC100_0 03219519

NYC-WTC_000437777

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000437777Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →