QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

project/sampling event.

All data generation and collection operations shall include at least one field sampling technical systems audit (TSA) at the start of field sampling activities so that effective corrective action measures can be implemented to mitigate the extent and impact of identified nonconformances. A thorough on-site audit shall be conducted during which sampling design, equipment, instrumentation, supplies, personnel, training, sampling procedures, chain-of-custody, sample handling and tracking, data reporting, data handling and management, data tracking and control, and data review procedures are examined for conformance with the QAPP. At least one field sampling TSA shall be performed at the start of field sampling activities. Results of the TSA shall be forwarded to the EPA QA Officer and EPA Site Coordinator within 14 days of the event. Additional TSAs may be specified at the discretion of the EPA Site Coordinator. EPA reserves the right to conduct unannounced TSA for all contracts.

12.1 Assessment Findings and Corrective Action Responses

In addition to the following, the Corrective Action procedure shall be conducted in accordance with the relevant sections of the Primary Contractor’s and analytical laboratories’ Quality Assurance Manuals: Assessment And Response Actions.

All provisions shall be taken in the field and laboratory to ensure that any problems that may develop shall be dealt with as quickly as possible to ensure the continuity of the project/sampling events. Field modifications to procedures in the QAPP must be approved verbally by the EPA Site Coordinator before the modifications are implemented and then documented in the Site Eogbook and the Sampling Project Report. Corrective action in the field may be necessary when the sampling design is changed. A change in the field may include, for example: increasing the number or type of samples or analyses; changing sampling locations and/or modifying sampling protocol. When this occurs, the Primary Contractor shall identify any suspected technical or QA deficiencies and note them in the field logbook. The analytical laboratory QA officer shall be responsible for assessing the suspected deficiency and determining the impact on the quality of data.

13.0 QA Management Reports

Periodic QA management reports ensure that managers and stakeholders are updated on project status and results of all QA assessments. Efficient communication of project status and problems allows project managers to implement timely and effective corrective actions so data generated

-33-

CITY_21MC100_002649206

NYC-WTC_000442696

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442696Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →