NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 50 pages

QA/PM plan for WTC indoor environment, 2005

Machine-extracted title · confidence 50%

Draft quality assurance project plan for indoor environment impacts at WTC.

NYC-WTC_000442657–000442706
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Title: QAPP - Extent of WTC Impacts to the Indoor Environment Date: April 2005

can meet PQOs. The Primary Contractor shall provide EPA with all data, original field forms/data sheets, and chain of custody forms for this project. For the duration of the project, on every Wednesday the Primary Contractor shall submit an email to EPA providing a field status rcport/QA management report, indicating the work completed during the prior week. Assessment checklists, reports, requests for corrective action letters, and the corrective response letters (refer to Section 12.1) shall be included as attachments to or referenced in the QA management reports.

All QA management reports shall be included as attachments to the final project report. The following issues shall be included in the final project report, either as part of the QA management report or in a QA/QC section of the final project report:

Summary of project QA/QC programs and training conducted during the project; Conformance of project activities to QAPP requirements and procedures; Status of project and schedule delays; Deviations from the approved QAPP and approved amendments to the QAPP; Results and trends of proficiency testing (PT) samples performed by all laboratories (per analytical group, matrix, and concentration level); Description and findings of TSAs and other assessments; Results of data review activities in terms of amount of usable data generated; Required corrective actions and effectiveness of corrective action implementation; Data usability assessments in terms of precision, accuracy, representativeness, completeness, comparability, and sensitivity; and Eimitations on the use of measurement data generated.

14.0 Final Project Report

The issues listed above must be addressed in the QA management reports (as attachments to the final project report) or the QA/QC section of the final project report to be submitted to EPA within 30 days from the completion of the sampling portion of the project. The final project report shall be prepared to provide a detailed accounting of what occurred during this project. Information provided shall include: time of major events, dates, personnel on site (including affiliations), summarize and describe the sampling program and field activities, and include any deviations from the QAPP, SOPs, and standard methods. Maps depicting site layout, contaminant source areas, and sample locations shall be included in the project report. A map depicting each building unit and the sample locations shall be generated in a 24" x 36" format. Information regarding the analytical methods or procedures employed, sample results, QA/QC results, chain of custody documentation, laboratory correspondence, any deviations from the QAPP, SOPs, and standard methods, and raw data shall be provided within the QA management reports (as attachments to the final project report) or the QA/QC section of the final project report. The final project report must also address additional data quality concerns, including, but not limited to, the

-34-

CITY_21MC100_002649207

NYC-WTC_000442697

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442697Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →