NYC 9/11 Public Portal Document
EM 1110-2-3800
1 Mar 72
eXCAVAHON Une
AOVANCfO
PIfeSPLir FBOM PBEWOUS BLAST ruesrLiTHOLCJ
I
eXCAVATIOH LMe
I
=5^
Aov4Ncro LW« or T
F»fSFLITTINC MOLfS —— EXCAVATED
f AREA MAIN BLAST AATTCBN
I
L 1
IJ FT
rr^ 0
I
o
I
MAIN BLAST MATTeMW
EXCAVATED AREA
ruEsrciT ruACTuM
FROM AATVIOvriHOr
EXCAVATED AREA
O. PLAN OF TYPICAL b. PLAN OF typical side-cut OR
through-cut pattern BENCH BLASTING PATTERN
(CourttsY of Pacific Builder A Engineer)
Fig. 5-20. Relation of pre split to main
pattern (after Veith22)
(3) Presplitting Horizontal and Vertical Corners, Pre splitting
corners is a major problem. Battering is not always acceptable and
right angles are required. On inside corners the presplit fracture
often propagates into the adjacent wall, and on outside corners the
right angle is difficult to attain and preserve. One method involves
placing one of the loaded holes at the corner. Another method uti
lizes unloaded guide holes at one-half spacing, in place of loaded holes
(Fig. 5-21) in the vicinity of the corner, but some CE and Bureau of
Mines personnel feel that such guide holes have little value. Some
CE project specifications require line drilling (c below) at the
corners.
(4) Horizontal Presplitting. Presplit holes may be carried into
a steep face to form a horizontal fracture above the existing floor.
Normal vertical holes may break below the required grade, so a hori
zontal row of holes, about 3 in. in diameter and spaced about 24 in.
apart may be preferred. Horizontal presplitting and subsequent exca
vation blasting form an acceptable bench at the desired level. The
technique should be considered in grade excavation along a rock cliff
where it is particularly important to preserve the edge and avoid
excessive fill downslope.
5-20
CITY_21MC100_0 12669691
NYC-WTC_000435921
OCR can misread numbers and units. Confirm readings against the page image before using them.