Army blasting manual excerpt, 1972

Machine-extracted title · confidence 22%

Publishers’ manual excerpt on blasting for surface excavations.

NYC-WTC_000435845–000435989
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EM 1110-2-3800 1 Mar 72

contractor what th.? work is to be and the conditions he will encounter. At present, no “Guide Specifications for Civil Works Construction" on drilling and blasting exist. Certain provisions are included in specifi­ cations of CE Districts to ensure desired results. Chapter 5 of this manual includes information on basic blasting techniques that may be helpful in preparation of these specifications, and a few sample speci­ fications are presented in Appendix B.

b. The contractor can be closely restricted by specifications that require procedures assuring no damage to the excavation or adjacent structures. An advantage of this type of specification is that it gives a legal basis for the Contracting Officer to supervise the contractor’s compliance. Other specifications may allow the contractor relative freedom to choose his procedure as long as the final excavation is sat­ isfactory. Incentive can be included in such specifications: e.g., the contractor may find it to his advantage or disadvantage in concrete pay­ ment according to whether his final rock surface (after scaling) falls within the rock excavation tolerances.

1-6. Working Relationships. A cooperative spirit should be maintained among CE personnel, drillers, and blasting crew if the best results are to be obtained. Although the inspector monitors the drilling and blast­ ing operations, he does not take over the role of foreman for the con­ tractor, i.e., should refrain from giving orders directly to workmen. A thorough knowledge of drilling and blasting techniques is the best assur­ ance of a satisfactory job. Chapters 2 through 5 of this manual are intended to help in this regard.

1-7. Geological Information. The geology of the project can be a major factor in a successful blasting job. The bidding documents should reflect the geological conditions and establish procedures com­ patible with the results desired. Design memoranda and technical letters covering the geology of the project site should be made available to and be carefully reviewed by the field forces. For details cf the effects of geological conditions on blasting, see Chapter 6.

1-3

CITY_21MC100_0 12669626

NYC-WTC_000435856

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000435856Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →