FINANCIAL REPORT
This projected has been completed under budget. Significant cost savings to the
government were realized in the area of travel by using local OSHA personnel
whenever possible. An additional cost savings in the area of personnel
compensation was realized. The OSHA Salt Lake Technical Center’s analysis
capacity enabled them to keep premium pay to a minimum while meeting field
demands The table below is a financial summary for the project during this
reporting period:
BUDGET BUDGETED IN TOTAL
CATEGORY AGREEMENT EXPENDITURES
Personnel $68,000.00 $32,252.28
T ravel_______ $100,400.00 $43,674.97
Equipment $78,551.00 $31,938.90
Supplies_____ $5,483.00 $3,360.48
Other (Sample $2,000.00 $308.00
Shipping Costs)
Total $254,434.00 $111,534.63
This table represents the total bugeted monies and all logged expenditures
against this agreement at the time of the drafting of this report (4/25/03). Any
additional expenditures not logged will be processed in accordance with the said
provisions of these interagency agreements.
CONCLUSIONS
Based on the results of this inspection project, OSHA found the exposure risks to
workers is very low as long as the contractors involved continue to follow the
work practices required by contract. The risks posed by safety hazards,
however, is somewhat greater. Care must be taken by the contractors to
minimize safety hazards such as fall, ladder, and electrical hazards identified by
OSHA during its inspection activities and they need to ensure continued
compliance with OSHA’s hazard communication and personal protective
equipment standards. These worksites are considered low risk and OSHA
believes no further programmed Agency safety and health intervention is
necessary. OSHA will continue to respond, however, to employee complaints,
referrals, and other agency requests for assistance relative to this project.