NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
NYC-WTC_000428441–000428450OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
This comment has been accepted and Subsection 3.4 of the Plan has been revised to reflect this change.
15. The June 23, 2005 DOL variance decision amendment was in reference to the removal of rooftop cooling tower transite and caulking materials. The first bullet item in this subsection also discusses the removal of exterior facade aluminum panel ACBM caulking and localized removal of exposed exterior spray-on fireproofing as part of Phase II. It is our understanding that these other materials would be removed as part of the Phase I work and that the rooftop cooling tower transite and caulking materials may be removed in either Phase I or Phase II. LMDC should revise the Draft Deconstruction Plan to reference correctly the other materials to be removed under the Phase I activities discussed in Subsection 3.3.
This comment has been accepted and Subsection 3.4 of the Plan has been revised to reflect this change. Note removal of asbestos caulking associated with exterior aluminum panel column covers and fascia remains in Phase II.
Subsection 4.0 Target Parameters/COPCs
16. LMDC states that the target parameters identified for monitoring during the 4 Albany Street abatement and demolition program were considered in developing the list of target parameters for the 130 Liberty Street building. Further, LMDC states that most notably, the Ambient Air Monitoring Program adopts the two tiered system of action levels approved for use at 4 Albany Street. LMDC should specify PM2.5 on the list of target parameters to be included in the monitoring program since it was an analyte specified in the 4 Albany Street monitoring program. It is essential that these emissions from the deconstruction be controlled and monitored.
See Responses to Comments #3 and #4. PM 2.5 has been added to the target parameter list for monitoring at all network sites.
Subsection 5.0 Sampling and Analyses Methodology
17. This subsection discusses four phases, if LMDC plans on conducting four phases, then the word “three” should be replaced with “four” in the second sentence.
This comment has been accepted and Section 5 has been revised as requested to reflect the correct number ofphases.
18. The detection limits for XRF metals analysis may be too high to achieve the action levels listed in the plan. ICP-MS, rather than XRF, would be a more appropriate method.
XRF in concert with high volume air sampling (> 1000 m3) will provide adequate detection limits for the target metals with the sole exception of beryllium. ICAP
6
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114763
NYC-WTC_000428446
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428293
Chain-of-custody for Ambient Air Monitoring Program at 130 Liberty Street (Aug 2005).
15 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421884
Final Revised ambient air monitoring plan for 130 Liberty Street; August 24, 2005.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427190
Chain-of-custody for August 2005 ambient air monitoring at 130 Liberty Street deconstruction site, LMDC.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438517
Ambient air program report for 130 Liberty Street deconstruction August 2005.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445084
Ambient air monitoring report for the 130 Liberty Street deconstruction project.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similar indexed content
NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
Similar indexed content
NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similar indexed content
NYC-WTC_000428293
Chain-of-custody for Ambient Air Monitoring Program at 130 Liberty Street (Aug 2005).
Similar indexed content
NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
Similar indexed content