NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 10 pages

Ambient air monitoring plan comments, 4 Albany

Machine-extracted title · confidence 38%

Section 2 comments on ambient air monitoring criteria for abatement projects.

NYC-WTC_000445893–000445902
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 2 - AMBIENT AIR MONITORING PROGRAM General Comments

1. EPA suggests you adopt the same substantive criteria/requirements within the ambient air monitoring plan applied during the abatement and demolition of 4 Albany Street.

This comment has been accepted. The June 2005 Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project that provided the basis for these EPA comments adopted many of the features of the of the 4 Albany Street Plan (page 1 June 2005 Draft Plan). Similarly, the revised Ambient Air Monitoring Program dated August 2005 (August 2005 Ambient Air Monitoring Program) adopts essentially all of the substantive criteria and requirements of the 4 Albany Street Plan.

2. The June 2005 version of the Ambient Air Monitoring Program states that there will be a Preparation Phase which will include: erection of scaffolding and hoists on the entire exterior of the building; erection of sidewalk sheds; and removal of existing netting. Prior information provided to the regulators indicated that exterior abatement work, and roof, facade, and general exterior areas requiring clean-up would be addressed as part of the Phase I portion of the project. The June 10, 2005 variance decision amendment from the DOL dealing with asbestos for the majority of the aforementioned work and the June 23, 2005 variance decision amendment for the rooftop cooling tower transite and caulking materials were based in part on representations from LMDC that these activities would be conducted as part of Phase I, with the exception of the rooftop cooling tower transite and caulking materials removal that LMDC indicated would be part of Phase II of the deconstruction. DOL reviewed and approved these requests understanding that the activities specified in the variances were part of Phase I, with the potential that the rooftop cooling tower transite and caulking materials may be removed in either Phase 1 or Phase 11. Additionally, LMDC stated in the third paragraph of the Waste Sampling and Management Section that Phase I of the Deconstruction Project includes the cleaning of exterior surfaces as necessary to facilitate the erection of the man-hoist and the crane.

Revision of this subsection, and any other subsection of the Draft Deconstruction Plan where reference is made to the “Preparation Phase”, is needed to state that this work will be conducted as part of Phase I activities. The conditions specified in the June 10, 2005 and June 23, 2005 DOL variance decision amendments would apply regardless of the manner in which LMDC interprets the phases for this project. For example, this variance decision requires proposed air monitoring for contaminants other than asbestos must be submitted to the regulatory agencies for their review and acceptance prior to commencement of any work, including, but not limited to, scaffolding installation, exterior regulated abatement work areas, facade cleaning, netting removal, hoist/scaffold tie- ins and tent enclosure work.

CITY_21MC100_003243523

NYC-WTC_000445893

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000445893Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000427338

Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.

Similar indexed content

NYC-WTC_000428441

Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.

Similar indexed content

Compare copies and versions →