NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Section 2 comments on ambient air monitoring criteria for abatement projects.
NYC-WTC_000445893–000445902OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
bottom floor of the next series of floors to be abated. In effect, these “floating” monitors are intended to monitor abatement and demolition work occurring immediately above them. The scaffolding monitoring locations would be sampled for the same parameters as the eight street level and elevated level stations during the abatement and demolition
phases. Therefore, Table 1, Table 3 and Table 4 should be revised to include these additional monitoring stations.
This comment has been accepted. As per responses to Comments #8 and #9 four (4) scaffolding or “floating stations” are now included in the monitoring network. Figure 2, Table 1, 3 and 4 and Section 3 of the August 2005 Ambient Air Monitoring Program reflects this change.
Subsection 3.2. Preparation Phase
11. Since portions of the Phase I activities are referenced as “the Preparation Phase,” LMDC needs to add the following language to this subsection, “The Preparation Phase air monitoring will follow the same schedule and frequency as described below in Phase I and will commence with the start of Preparation Phase site work.”
This comment has been accepted and Subsection 3.2 has been revised as reflected in the August 2005 Ambient Air Monitoring Program.
12. LMDC states that the Phase II work will include “the exterior abatement.” EPA understands that exterior abatement work will be part of the Phase I activities. Therefore, this subsections needs to be revised accordingly.
This comment has been accepted and Subsection 3.2 has been revised accordingly.
Subsection 3.3. Phase I - Asbestos and COPC Abatement
13. LMDC states that the Phase 11 work will include the cleaning of the exterior, the roof, and roof equipment; and, states that “abatement” is a portion of the Phase II work. If roof, facade and general exterior areas requiring clean- up will be cleaned as part of the Phase I activities, with the exception of the rooftop cooling tower transite and caulking materials, this subsection needs to be revised to state that information clearly.
This comment has been accepted and Subsection 3.3 has been revised accordingly.
Subsection 3.4. Phase II - Structural Deconstruction
14. LMDC states that the Phase II work will include the cleaning of the exterior, the roof, and roof equipment. If roof, facade and general exterior areas requiring clean- up will be cleaned as part of the Phase I activities, with the exception of the rooftop cooling tower transite and caulking materials, this subsection needs to be revised to state that information clearly.
5
CITY_21MC100_003243527
NYC-WTC_000445897
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428441
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428293
Chain-of-custody for Ambient Air Monitoring Program at 130 Liberty Street (Aug 2005).
14 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438517
Ambient air program report for 130 Liberty Street deconstruction August 2005.
14 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445084
Ambient air monitoring report for the 130 Liberty Street deconstruction project.
14 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427190
Chain-of-custody for August 2005 ambient air monitoring at 130 Liberty Street deconstruction site, LMDC.
14 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
14 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421884
Final Revised ambient air monitoring plan for 130 Liberty Street; August 24, 2005.
14 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428441
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428441
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similar indexed content
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similar indexed content
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similar indexed content
NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
Similar indexed content
NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
Similar indexed content