SECTION 2 - AMBIENT AIR MONITORING PROGRAM General Comments
1. EPA suggests you adopt the same substantive criteria/requirements within the ambient air monitoring plan applied during the abatement and demolition of 4 Albany Street.
This comment has been accepted. The June 2005 Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project that provided the basis for these EPA comments adopted many of the features of the of the 4 Albany Street Plan (page 1 June 2005 Draft Plan). Similarly, the revised Ambient Air Monitoring Program dated August 2005 (August 2005 Ambient Air Monitoring Program) adopts essentially all of the substantive criteria and requirements of the 4 Albany Street Plan.
2. The June 2005 version of the Ambient Air Monitoring Program states that there will be a Preparation Phase which will include: erection of scaffolding and hoists on the entire exterior of the building; erection of sidewalk sheds; and removal of existing netting. Prior information provided to the regulators indicated that exterior abatement work, and roof, facade, and general exterior areas requiring clean-up would be addressed as part of the Phase I portion of the project. The June 10, 2005 variance decision amendment from the DOL dealing with asbestos for the majority of the aforementioned work and the June 23, 2005 variance decision amendment for the rooftop cooling tower transite and caulking materials were based in part on representations from LMDC that these activities would be conducted as part of Phase I, with the exception of the rooftop cooling tower transite and caulking materials removal that LMDC indicated would be part of Phase II of the deconstruction. DOL reviewed and approved these requests understanding that the activities specified in the variances were part of Phase I, with the potential that the rooftop cooling tower transite and caulking materials may be removed in either Phase I or Phase II. Additionally, LMDC stated in the third paragraph of the Waste Sampling and Management Section that Phase I of the Deconstruction Project includes the cleaning of exterior surfaces as necessary to facilitate the erection of the man-hoist and the crane.
Revision of this subsection, and any other subsection of the Draft Deconstruction Plan where reference is made to the “Preparation Phase”, is needed to state that this work will be conducted as part of Phase I activities. The conditions specified in the June 10, 2005 and June 23, 2005 DOL variance decision amendments would apply regardless of the manner in which LMDC interprets the phases for this project. For example, this variance decision requires proposed air monitoring for contaminants other than asbestos must be submitted to the regulatory agencies for their review and acceptance prior to commencement of any work, including, but not limited to, scaffolding installation, exterior regulated abatement work areas, fagade cleaning, netting removal, hoist/scaffold tie- ins and tent enclosure work.
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114758
NYC-WTC_000428441
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000428293
Chain-of-custody for Ambient Air Monitoring Program at 130 Liberty Street (Aug 2005).
15 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
14 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421884
Final Revised ambient air monitoring plan for 130 Liberty Street; August 24, 2005.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427190
Chain-of-custody for August 2005 ambient air monitoring at 130 Liberty Street deconstruction site, LMDC.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438517
Ambient air program report for 130 Liberty Street deconstruction August 2005.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445084
Ambient air monitoring report for the 130 Liberty Street deconstruction project.
14 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000427338
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448332
DOL 12 NYCRR Part 56 reference and regulatory context for asbestos.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438568
Page 1 of a chain-of-custody form referencing NY CRR Part 56 and the NYC WTC records.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125076
Fax transmission regarding updated asbestos project submittals and requested changes for the 130 Cedar Street permit application.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Section 2 comments re criteria for ambient air monitoring plan, June-Aug 2005.
Similar indexed content
NYC-WTC_000445893
Section 2 comments on ambient air monitoring criteria for abatement projects.
Similar indexed content
NYC-WTC_000445115
Comments on ambient air monitoring plan related to the 130 Liberty Street project.
Similar indexed content
NYC-WTC_000428293
Chain-of-custody for Ambient Air Monitoring Program at 130 Liberty Street (Aug 2005).
Similar indexed content
NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
Similar indexed content