Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
z z
-< ■<
o Ambient Air Monitoring Program Section No. 13 o
co
g Quality Assurance Project Plan Revision No.: 0
o 130 Liberty Street - NY, NY Date: August 2005
I Lower Manhattan Development Corporation Page 93 of 116 “0
o c
o CT
o
o'
ro "0
oo o
Table 13-4. Summary of Calibration Procedures for Fixed Laboratory Analyses 9L
Parameter/Instrument Frequency of Calibration Acceptance Criteria Corrective Action O
PM2.5 Balance Calibration: daily before use ±3 pg Perform necessary equipment o
o
and every 10 samples (200.000 mg) maintenance and check calibration c
3
Calibration Verification: daily before ±3 ng standards. CD
3
use (100.000 mg)
O
O
m
o
J]
□0
s
>
c
□0
o
o
o
L2005-346 Rev. 1
■xl
CO
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000428417Source: NYC Law Department, mirrored locally