Ambient Air Monitoring Program Section No. 7
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 26 of 116
7.1.1 Sampling Tasks
Sampling phases will consist of the following segments: Background, Phase I - Preparation
Phase and Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction.
General descriptions of the work included in each phase are presented in the Ambient Air
Monitoring Program for the 130 Liberty Street Deconstruction Project, August 2005. Sampling
locations are noted on Figures 7-1 and 7-2. (Note: locations at all twelve (12) monitoring
locations not shown.) Sampling methods, sampling QC, sample handling and custody are
discussed in other sections of this QAPP. Tables 7-la, 7-lb, and 7-lc provide a general
summary of target parameters, and numbers of field samples and QC samples expected to be
collected on a weekly basis for each phase of the program. Tables 7-2 and 7-3 provide a
summary of sampling frequencies after the background phase has been completed.
Background
The background ambient air sampling period will consist of two weeks (14 consecutive calendar
days) of monitoring performed immediately prior to the start of abatement activities. Samples
will be collected at five (5) stations (4 ground level and 1 roof top location) in the monitoring
network. All target parameters will be collected over a 24-hour integrated period with the
exception of asbestos, silica, PMio, PM2.5, and mercury. Mercury will be monitored utilizing a
direct read mercury analyzer. PMio andPM2.5 will be monitored continuously at each of the five
(5) sites while asbestos and silica measurements will be taken at a frequency of once per day
over an (8) hour period at each of the sites.
Phase I: Preparation and Asbestos and COPC Abatement and Removal
During the Phase I (Preparation & Abatement Phase) air monitoring will take place at eight (8)
stations each day. Once scaffolding has been erected, air monitoring will take place at twelve
(12) stations each day. During the first three (3) days only of Phase I work, samples will be
collected at twelve (12) stations each day for semivolatile organics to include PCDDs/PCDFs,
PAHs and PCBs. After this initial three (3) day period, samples for semivolatile organics will be
reduced to a single location per week employing the twelve (12) station network. More
specifically, samples will not be collected at all twelve (12) stations each day; rather a single set
of samples will be collected each day at a single station in the network. This sequence will be
repeated each day using a different station each day until all of the twelve (12) stations have been
used. The schedule will be repeated until project completion.
The semivolatile organic samples collected employing this weekly sampling frequency will not
be processed for analyses; rather they will be placed in archival storage at the laboratory. A
single set of samples will be selected from each sample set representing seven (7) days to
undergo analyses for PCDDs/PCDFs, PAHs and PCBs. The station with the highest 24-hour
average PMio concentration (ug/m3) recorded with a collocated organic sample each week will
be selected for semivolatile organic analyses.