Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 7 Quality Assurance Project Plan Revision No.: 0 130 1 iberly Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 26 of 116

7.1.1 Sampling Tasks

Sampling phases will consist of the following segments: Background, Phase I - Preparation Phase and Phase I - Asbestos and COPC Abatement, and Phase II - Structural Deconstruction. General descriptions of the work included in each phase are presented in the Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project, August 2005. Sampling locations are noted on Figures 7-1 and 7-2. (Note: locations at all twelve (12) monitoring locations not shown.) Sampling methods, sampling QC, sample handling and custody are discussed in other sections of this QAPP. Tables 7-la, 7-lb, and 7-lc provide a general summary of target parameters, and numbers of field samples and QC samples expected to be collected on a weekly basis for each phase of the program. Tables 7-2 and 7-3 provide a summary of sampling frequencies after the background phase has been completed.

Background

The background ambient air sampling period will consist of two weeks (14 consecutive calendar days) of monitoring performed immediately prior to the start of abatement activities. Samples will be collected at five (5) stations (4 ground level and 1 roof top location) in the monitoring network. All target parameters will be collected over a 24-hour integrated period with the exception of asbestos, silica, PMio, PM2.5, and mercury. Mercuiy will be monitored utilizing a direct read mercury analyzer. PMio and PM2.5 will be monitored continuously at each of the five (5) sites while asbestos and silica measurements will be taken at a frequency of once per day over an (8) hour period at each of the sites.

Phase I: Preparation and Asbestos and COPC Abatement and Removal

During the Phase I (Preparation & Abatement Phase) air monitoring will take place at eight (8) stations each day. Once scaffolding has been erected, air monitoring will take place at twelve (12) stations each day. During the first three (3) days only of Phase I work, samples will be collected at twelve (12) stations each day for semivolatile organics to include PCDDs/PCDFs, PAHs and PCBs. After this initial three (3) day period, samples for semivolatile organics will be reduced to a single location per week employing the twelve (12) station network. More specifically, samples will not be collected at all twelve (12) stations each day; rather a single set of samples will be collected each day at a single station in the network. This sequence will be repeated each day using a different station each day until all of the twelve (12) stations have been used. The schedule will be repeated until project completion.

The semivolatile organic samples collected employing this weekly sampling frequency will not be processed for analyses; rather they will be placed in archival storage at the laboratory. A single set of samples will be selected from each sample set representing seven (7) days to undergo analyses for PCDDs/PCDFs, PAHs and PCBs. The station with the highest 24-hour average PMio concentration (ug/m3) recorded with a collocated organic sample each week will be selected for semivolatile organic analyses.

L2005-346 Rev. 1

CITY_21MC100_003243432

NYC-WTC_000441587

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441587Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

Compare copies and versions →