Ambient Air Monitoring Program, Draft PBP

Machine-extracted title · confidence 51%

Quality Assurance Project Plan for ambient air monitoring at 130 Liberty Street deconstruction, Aug 2005.

NYC-WTC_000441561–000441677
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambient Air Monitoring Program Section No. 13 Quality Assurance Project Plan Revision No.: 0 130 Liberty Street - NY, NY Date: August 2005 Lower Manhattan Development Corporation Page 90 of 116

Table 13-4. Summary of Calibration Procedures for Fixed Laboratory Analyses Parameter/Instrument Frequency of Calibration Acceptance Criteria Corrective Action Metals/ICP/MS Initial Calibration: daily, every 24 NA; monitored by ICV Perform necessary equipment hours or every time instrument is set maintenance and check calibration up_____________________________ standards. Initial Calibration Verification: 90-110% of true value immediately after initial calibration Continuing Calibration Verification: 90-110% of true value after every 10 samples and at end of analytical sequence Mercury/CVAFS Initial Calibration: prior to sample % RSD < 15 or r^ > 0.999; percent Perform necessary equipment analysis recovery of each standard in curve 90- maintenance and check calibration 110% when calculated with curve standards. with the exception of the lowest concentration standard which must be 75425%_________________________ Initial Calibration Verification: 90-110% of true value immediately after initial calibration Continuing Calibration Verification: 90-110% of true value every 10 samples or every 12 hours, whichever is more frequent and at end of analytical sequence Dioxins & Furans/HRGC/ HRMS Initial Calibration: prior to sample % RSD of RRFs must be < 10 for Perform necessary equipment analysis; once every 6 months or unlabeled standards; % RSD of RRFs maintenance and check calibration whenever indicated by continuing must be < 20 for labeled standards. standards. calibration S/N ratio must be > 10:1 for labeled standards and >5:1 for unlabeled standards. o H

S o o o I o o co

CO L2005-346 Rev. 1 CO cn

NYC-WTC_000441651

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441651Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000449648

Draft QA Plan for ambient air monitoring at 130 Liberty Street deconstruction project, Aug 2005.

Similar indexed content

NYC-WTC_000444248

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 2005.

Similar indexed content

NYC-WTC_000447031

QA plan document for ambient air monitoring program for Liberty Street deconstruction.

Similar indexed content

NYC-WTC_000449908

QA plan for ambient air monitoring at 130 Liberty Street deconstruction project, Sept 7, 2005.

Similar indexed content

Compare copies and versions →