NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 7
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 25 of 116
7.0 PROJECT/TASK DESCRIPTION
This section provides a general overview of the activities that will be performed and how and
when they will be performed. Specific details for individual project activities will be discussed
in later sections of the QAPP.
7.1 Project Overview
Based upon the companion document Ambient Air Monitoring Program for the 130 Liberty
Street Deconstruction Project, August 2005, the primary objective of this investigation is to
monitor air quality in the vicinity of 130 Liberty Street during the deconstruction of the budding
on that property. The plan consists of monitoring of fugitive dusts in the vicinity of the
deconstruction site on both a real-time or continuous basis as well as a time-weighted or
integrated basis. These objectives will be satisfied by the sampling and analysis program outlined
in Sections 7.1.1 and 7.1.2. Laboratories performing these analyses are summarized in Section
4.3.4 of the QAPP.
There are multiple aspects and levels to the overall air monitoring program proposed for the
deconstruction of 130 Liberty Street. The following is a brief summary of the three (3)
components or levels of air monitoring proposed for the project:
“Level 1”: The subcontractors performing aspects of Phase I deconstruction work (largely
interior, non-stimctural efforts) will be responsible for collecting air samples on then-
personnel directly performing various work activities to determine airborne levels of
contaminants potentially generated by the work at the source as required by OSHA.
“Level 2”: The next layer of sampling is for ICR 56 compliance. ICR 56-required sampling
will entail sampling the ambient air inside the building during Phase I work outside of work
areas, at the personnel and waste load out decontamination stations and other locations. In
addition, samples will be collected, as required, outside the building within ten (10) feet of
the negative pressure ventilation exhaust. This sampling is further described in the Asbestos
and COPC Abatement and Removal Plan sections of the Phase I Deconstruction Plan
(August, 2005).
“Level 3”: Beyond that, there will be continuous monitoring of the exterior ambient air
within the site boundaries and at specific elevated locations, as described in the Ambient Air
Monitoring Program (August 2005). This QAPP further defines the technical approach and
provides the anticipated schedule of activities for the “Level 3” air monitoring. The other
two “levels” of air monitoring outlined above are documented in the Health and Safety Plan
and The Asbestos and COPC Abatement and Removal Plan sections of the Deconstruction
Plan (August, 2005).
L2005-346 Rev. 1
CITY_DEP_WORBY_CANNATA_SUBP_000114666
NYC-WTC_000428349
OCR can misread numbers and units. Confirm readings against the page image before using them.