15.3 Additional QAPP Non-Conformances
15.3.1 Field Non-Confornuinces
Corrective action in the field may be needed when the sample network is changed (i.e., more/less
samples, sampling locations other than those specified in the QAPP), or when sampling
procedures and/or field analytical procedures require modification, etc. due to unexpected
conditions. The field team may identify the need for corrective action. The TRC Field Sampling
Coordinator will approve the corrective action and notify the TRC Project Manager. The TRC
Project Manager, in consultation with the EPA Region 2 Project Manager, if necessary, will
approve the corrective action. The TRC Field Sampling Coordinator will ensure that the
corrective action is implemented by the field team. Corrective actions will be implemented and
documented in the field logbook. Documentation will include:
• A description of the circumstances that initiated the corrective action,
• The action taken in response,
• The final resolution, and
• Any necessary approvals.
No staff member will initiate corrective action without prior communication of findings through
the proper channels. If necessary, a problem resolution audit will be conducted.
15.3.2 Laboratory Non-Conformances
Corrective action in the laboratory may occur prior to, during, and after initial analyses. A
number of conditions such as broken sample media, omissions or discrepancies with chain-of-
custody documentation, and potentially high concentration samples may be identified during
sample log-in or just prior to analysis. Following consultation with laboratory analysts and
Laboratory Section Leaders, it may be necessary for the Laboratory QA Manager to approve the
implementation of corrective action. The analytical methods specify some conditions during or
after analysis that may automatically trigger corrective action or optional procedures. These
conditions may include dilution of samples, additional sample extract cleanup, automatic
reinjection/reanalysis when certain QC criteria are not met, loss of sample through breakage or
spillage, etc.
The analyst may identify the need for corrective action. The Laboratory Section Leader, in
consultation with the staff, will approve the required corrective action to be implemented by the
laboratory staff. The Laboratory QA Manager will ensure implementation and documentation of
the corrective action. If the nonconformance causes project objectives not to be achieved, the
TRC Project QA Officer will be notified. The TRC Project QA Officer will notify the TRC
Project Manager, who in turn will contact all levels of project management for concurrence with
the proposed corrective action.