Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Ambient Air Monitoring Program Section No. 15
Quality Assurance Project Plan Revision No.: 0
130 Liberty Street - NY, NY Date: August 2005
Lower Manhattan Development Corporation Page 108 of 116
These corrective actions are performed prior to release of the data from the laboratory. The
corrective action will be documented in both the laboratory’s corrective action files, and the
narrative data report sent from the laboratory to TRC. If the corrective action does not rectify the
situation, the laboratory will contact the TRC Project QA Officer, who will determine the action
to be taken and inform the appropriate personnel. If necessary, a problem resolution audit will
be conducted.
15.4 Data Validation and Data Assessment Non-Conformances
The need for corrective action may be identified during either data validation or data assessment.
Potential types of corrective action may include resampling by the field team or
reinjection/reanalysis of samples by the laboratory. These actions are dependent upon the ability
to mobilize the field team and whether the data to be collected is necessary to meet the required
QA objectives. If the data validator or data assessor identifies a corrective action situation, the
TRC Project Manager will be responsible for informing the appropriate personnel. All corrective
actions of this type will be documented by the TRC Project Manager and maintained in the
project files.
L2005-346 Rev. 1
C ITY_D E P_WO RB Y_C AN N ATA_SU B P_000114749
NYC-WTC_000428432
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000428432Source: NYC Law Department, mirrored locally