NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 110 pages

QA/QC Plan, Environmental Monitoring Program

Machine-extracted title · confidence 54%

Quality Assurance Project Plan for Environmental Community Air Monitoring and Waste Management at Greenwich sites.

NYC-WTC_000427900–000428009
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

determined by a non-rcfercnce method utilizing Met One’s E-BAM Mass Monitor, which is a real-time monitor. BGI samplers will be used to collect PM2.5 via the US EPA standard reference method (40 CFR Part 50 Appendix L) at one location per day. An Tisch TE-6070 PM2.5 sampler will be collocated along side the real-time PM2.5 monitors as a QA check. The Tisch TE-6070 sampler will rotate on a monthly basis through all real-time PM2.5 monitor locations for the duration of the monitoring program.

10.2.10.1 PM2.5 - Reference Method via BGl Ambient Fine Particulate Sampler

PM2.5 (particles less than 2.5 micrometers in aerodynamic diameter) is collected on 47 mm PTFE membrane media at a volumetric sample rate of 16.67 Lpm after being size discriminated through two U.S. EPA designed inertial separators. Ambient temperature and barometric pressure measurements are made at actual sample conditions. A microprocessor and sophisticated volumetric flow control system arc integrated to maintain precise sampling parameters while sampling data are continuously logged into the processor memory. Five minute actual ambient temperature and pressure conditions with volumetric sample flow rate, filter temperature, and pressure are recorded. Measured values and identification of flags indicating any anomalies are recovered by the operator by downloading a sample summary to a laptop or handheld computer.

The sampler specification for the PM2.5 sampler is contained in 40 CFR Part 50 Appendix L. This document specifies the PM2.5 sampling limits, protocol, and instrument specifications. The BGI systems perform all of the functions required or recommended in the instrument specification part of the standard. The inlet has 2.5-micrometer (nominal) cutpoint. The inlet provides wind speed and direction independent sampling and removes particles larger than about 2.5 micrometers. Before sampling, the filters are equilibrated to constant temperature and relative humidity conditions and weighed. After sampling, the filters are again equilibrated to the constant temperature and humidity conditions and weighed. The mass concentration is then calculated by dividing the weight of the particulate captured on the filter by the volume of air (at ambient conditions) that passed through the sampler. The flow rate is required to be maintained within 5% of 16.67 liters per minute with a coefficient of variation (a measure of the average short-term variation in flow in %) of less than 2%. Equipment and supplies utilized with this sampling approach are as follows: • Filters - Preweighed 47-mm Teflon® filters. Filters should be stored and transported in petri dishes. • Forceps - Non-serrated forceps should be used to handle the 47-mm filters. • BGI PM2.5 Sampler - A sampling system that meets the requirements of 40 CFR Part 50 Appendix L for the sampling of PM2.5. The BGI sampler design incorporates a flow-indicating device, a thermometer, a barometer, and a timing control device into the sample monitor. • Manometer - A water or oil manometer is used to calibrate the flows of the samplers. • Timing/Control Device - A timing device capable of starting and stopping the sampler to obtain an elapsed run time of 24 hr ±1 hr. The accuracy of the timing

53

CITY_DEP_WORBY_CANNATA_SUBP_0001 01704

NYC-WTC_000427952

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427952Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000451195

QA plan for environmental air monitoring and waste management at NYC sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

Compare copies and versions →