NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
NYC-WTC_000427716–000427844OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005
Measures to Ensure Field Comparability Comparability is dependent upon the proper design of the sampling program and will be satisfied by ensuring that the QAPP is followed, sampling and analytical methodologies are followed, and that proper sampling and preservation techniques are used.
Measures to Ensure Laboratory Comparability Comparability is dependent on the use of the selected EPA and NIOSH methods that are appropriate for producing data that may be compared to the project Action Limits and the reporting of data in standardized units.
8.2.5 Sensitivity
Sensitivity is the ability of the instrument or method to detect the contaminants of concern at the level of interest.
Quantitation Limits Tables 8-la,b,c outline the required quantitation limits for each matrix, each analytical parameter and each analyte. These quantitation limits are significantly below the project Action Limits. In almost all cases, EPA or NIOSH methodologies were selected with specific requirements or modifications to achieve quantitation limits that are significantly below the project Action Limits. The laboratories selected will, at a minimum, meet the project quantitation limits included in Tables 8- Ia,b,c. Laboratories will need to adjust all quantitation limits based on dilutions, sample volumes, extract/digestate volumes, and cleanup procedures. In all cases, the adjusted quantitation limit (or sample quantitation limit) must be below the project Action Limit. In establishing the required quantitation limits for this program, these factors were considered in ensuring the project Action Limits would be achieved. Sensitivity will be maximized by following the EPA and NIOSH methods, utilizing experienced/trained laboratory personnel, and conducting laboratory audits.
8.2.6 Completeness
Completeness is a measure of the amount of valid data obtained from a measurement system compared to the amount that was expected to be obtained under normal conditions. “Normal conditions” are defined as the conditions expected if the sampling plan was implemented as planned.
Field Completeness Objectives Field completeness is a measure of the amount of (1) valid measurements obtained from all the measurements taken in the project and (2) valid samples collected. With the exception of the real-time measurements, the field completeness objective will be a minimum of 80 percent. This allows for the potential loss of samples due to sampling problems or media breakage during transport. The completeness objective for the real-time measurements (e.g., PMio, PM2.5, gaseous mercury) will be a minimum of 90 percent.
Laboratory Completeness Objectives Laboratory completeness is a measure of the
53
CITY_DEP_WORBY_CANNATA_SUBP_0001 01084
NYC-WTC_000427768
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424323
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423504
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
94 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444945
Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440780
Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443742
Chain-of-custody form for Environmental Community Air Monitoring Program plans at Greenwich Street and Thames Street, dated November 4, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427582
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
89 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444496
Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000424323
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000423504
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Plan document outlining community air monitoring for Greenwich and Thames sites.
Similar indexed content
Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.
Similar indexed content
Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.
Similar indexed content
Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
Similar indexed content
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
Similar indexed content