Air Monitoring Plan, Greenwich/Thames

Machine-extracted title · confidence 50%

Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.

NYC-WTC_000441133–000441266
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

Measures to Ensure Field Comparability Comparability is dependent upon the proper design of the sampling program and will be satisfied by ensuring that the QAPP is followed, sampling and analytical methodologies are followed, and that proper sampling and preservation techniques are used.

Measures to Ensure Laboratory Comparability Comparability is dependent on the use of the selected EPA and NIOSH methods that are appropriate for producing data that may be compared to the project Action Limits and the reporting of data in standardized units.

8.2.5 Sensitivity

Sensitivity is the ability of the instrument or method to detect the contaminants of concern at the level of interest.

Quantitation Limits Tables 8-la,b,c outline the required quantitation limits for each matrix, each analytical parameter and each analyte. These quantitation limits are significantly below the project Action Limits. In almost all cases, EPA or NIOSH methodologies were selected with specific requirements or modifications to achieve quantitation limits that are significantly below the project Action Limits. The laboratories selected will, at a minimum, meet the project quantitation limits included in Tables 8- la,b,c. Laboratories will need to adjust all quantitation limits based on dilutions, sample volumes, extract/digestate volumes, and cleanup procedures. In all cases, the adjusted quantitation limit (or sample quantitation limit) must be below the project Action Limit. In establishing the required quantitation limits for this program, these factors were considered in ensuring the project Action Limits would be achieved. Sensitivity will be maximized by following the EPA and NIOSH methods, utilizing experienced/trained laboratory personnel, and conducting laboratory audits.

8.2.6 Completeness

Completeness is a measure of the amount of valid data obtained from a measurement system compared to the amount that was expected to be obtained under normal conditions. “Normal conditions” are defined as the conditions expected if the sampling plan was implemented as planned.

Field Completeness Objectives Field completeness is a measure of the amount of (1) valid measurements obtained from all the measurements taken in the project and (2) valid samples collected. With the exception of the real-time measurements, the field completeness objective will be a minimum of 80 percent. This allows for the potential loss of samples due to sampling problems or media breakage during transport. The completeness objective for the real-time measurements (e.g., PMio, PM2.5, gaseous mercury) will be a minimum of 90 percent.

Laboratory Completeness Objectives Laboratory completeness is a measure of the

55

CITY_21MC100_003237325

NYC-WTC_000441187

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000441187Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000453085

Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.

Similar indexed content

NYC-WTC_000446622

Part V plan for Environmental Community Air Monitoring at Greenwich/Thames sites.

Similar indexed content

Compare copies and versions →