Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
Table 7. Elements Typically Contained in a Quality Assurance Project Plan (QAPP)
Title Page. Should include the name of the document Calibration procedures and frequencies. Discusses the
and the date it was prepared. The QA officer should sign calibration procedures to be used, the number and
the title page, ensuring that field and laboratory concentration of calibration standaids, and the
personnel are aware of the requirements for precision, calibration range and procedures to establish and verify
acciuacy, completeness, representativeness, and the calibration of instniments.
comparability.
Table of contents. Includes a listing of the QAPP Internal QC checks. Identifies the specific internal QC
elements and any appendices, figures, and tables. A list methods to be used, including analyses of method
of the recipients of official copies of tlie QAPP should blanks; use of laboratory control samples, and use of
also be provided. environmental samples as duplicates, matrix spikes, and
duplicates.
Project description. Consists of a general paragraph
describing the scope of work, general objectives, and Calculation of data quality indicators. Discusses how
required measurements. (If the project description is precision, accuracy, completeness, representativeness,
discussed in the field sampling plan, it does not need to and comparability goals are to be calculated from the
be repeated in the QAPP.) project data.
Proved organization and responsibility. Identifies key Corrective actions. Addresses con'ective actions that
field and laboratory personnel or organizations that arc must be implemented if QA specifications arc not met.
necessaiy for each analytical activity during the study. A Corrective actions could mclude resampling, reanalyzing
table or chart showing the organization and lines of samples, or auditing laboratory procedures. Persons
authority should be included. The organizational chart responsible for initiating these actions should be
should also include all subcontractors and their key identified.
points of contact. The QA officer should be
organizationally independent of project management so Data reduction, review, validation and reporting.
that tlie risk of conflict of interest is minimized. Discusses the data review process that is requued to
assure the validity of the data. Data reduction procedures
Data auality objectives. Describes the QA objectives for should be summarized and the persons responsible for
the data so that the data can achieve then- intended use. data reduction identified. The format for reporting the
Project-specific data quality objectives that have been data and the data reporting schedule should be specified.
identified for tire project, short-term decisions that will
be made during the project planning phase, and Preventive maintenance. Discusses the preventive
long-term decisions that will be made prior to project maintenance plan that will be implemented to minimize
closeout should be highlighted. downtime of field and laboratory instrumentation.
Sampling locations and procedures. References the Audits. Describes the performance, systems, data
sections of the field sampling plan that discuss the quality, and management audits that will be performed
general rationale for choosing sampling locations and onsite and at the laboratory.
the sampling procedures proposed for each matrix.
DC reports to management. Discusses QC reports that
Sample custody and holding times. References the will be prepared. These reports typically include an
appropriate sections (e.g., sample custody/ assessment of accuracy, precision, completeness,
documentation) of the field sampling plan for all custody representativeness, and comparability; audit results; and
and holding requirements pertaining to the field and significant QA problems encountered.
laboratory activities.
Sampling and analytical procedures. Identifies the
appropriate sampling and analytical test methods that
should be used for each environmental sample.
Source: Design, Installation and Utilization of Fixed-Fenceline Sample Collection and Monitoring System, US Army Corps, of Engineers, EM
200-1-5- 1 October 1997
10-2
CITY_DEP_WORBY_CANNATA_SUBP_000075902
NYC-WTC_000424735