Section 2 - Ambient Air Monitoring Program Revision No.: 0 130 Liberty Street Deconstruction Plan Date: September 7, 2005 Lower Manhattan Development Corporation
Table 7. Elements Typically Contained in a Quality Assurance Project Plan (QAPP) Title Page. Should include the name of the document Calibration procedures and frequencies. Discusses the and the date it was prepared. The QA officer should sign calibration procedures to be used, the number and the title page, ensuring that field and laboratory concentration of calibration standaids, and the personnel are aware of the requirements for precision, calibration range and procedures to establish and verify accuracy, completeness, representativeness, and the calibration of instruments. comparability. Table of contents. Includes a listing of the QAPP Internal QC checics. Identifies the specific internal QC elements and any appendices, figures, and tables. A list methods to be used, including analyses of method of the recipients of official copies of the QAPP should blanks; use of laboratory control samples, and use of also be provided. envuonmental samples as duplicates, matiix spikes, and duplicates. Pro ject description. Consists of a general paragraph describing the scope of work, general objectives, and Calculation of data quality indicators. Discusses how required measurements. (If the project description is precision, accuracy, completeness, representativeness, discussed in the field sampling plan, it does not need to and comparability goals are to be calculated from the be repeated in the QAPP.) project data.
Proved organization and responsibility. Identifies key Corrective actions. Addresses corrective actions that field and laboratory personnel or organizations that are must be implemented if QA specifications are not met. necessary for each analytical activity during the study. A Corrective actions could include resampling, reanalyzing table or chart showing the organization and lines of samples, or auditing laboratory procedures. Persons authority should be included. The organizational chart responsible for initiating these actions should be should also include all subcontractors and their key identified. points of contact. The QA officer should be organizationally independent of project management so Data reduction, review, validation and reporting. that the risk of conflict of interest is minimized. Discusses tire data review process tliat is required to assure the validity of the data. Data reduction procedures Data quality objectives. Describes the QA objectives for should be summarized and the persons responsible for the data so that the data can achieve their intended use. data reduction identified. The format for reporting the Project-specific data quality objectives that have been data and the data reporting schedule should be specified. identified for tire project, short-term decisions that will be made during the project planning phase, and Preventive maintenance. Discusses the preventive long-term decisions that will be made prior to project maintenance plan that will be implemented to minimize closeout should be highlighted. downtime of field and laboratory instrumentation.
Samp ling locations and procedures. References the Audits. Describes the performance, systems, data sections of the field sampling plan that discuss the quality, and management audits that will be performed general rationale for choosing sampling locations and onsite and at the laboratory. the sampling procedures proposed for each matrix. OC reports to management. Discusses QC reports that Sample custody and holding times. References the will be prepared. These reports typically include an appropriate sections (e.g., sample custody/ assessment of accuracy, precision, completeness, documentation) of the field sampling plan for all custody representativeness, and comparability; audit results; and and holding requirements pertaining to the field and significant QA problems encountered. laboratory activities. Sampling and analytical procedures. Identifies the appropriate sampling and analytical test methods that should be used for each environmental sample. Source: Design, Installation and Utilization of Fixed-Fenceline Sample Collection and Monitoring System, US Army Corps, of Engineers, EM 200-1-5-1 October 1997
10-2
CITY_21MC100_003240856
NYC-WTC_000446795
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441904
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
46 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421926
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000231976
Chain of custody documentation for the ambient air monitoring program during the deconstruction project at 130 Liberty Street dated September 7, 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427865
Ambient air monitoring program document for 130 Liberty Street deconstruction project, Sept 2005.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000424704
CoC-style document for air monitoring at 130 Liberty Street deconstruction site.
45 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449611
Final revised chain-of-custody for ambient air monitoring at 130 Liberty Street deconstruction site, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440674
Final revised ambient air monitoring report for 130 Liberty Street deconstruction, Aug 2005.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447824
Final revised deconstruction air monitoring program document for 130 Liberty Street project.
44 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000421851
Final Revised ambient air monitoring plan for the 130 Liberty Street deconstruction project, Aug 24, 2005.
44 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000444051
Ambient air monitoring program document for 130 Liberty Street deconstruction project.
Similar indexed content
NYC-WTC_000442832
Scope and on-site monitoring plan for ambient air at 130 Liberty Street deconstruction.
Similar indexed content
NYC-WTC_000437662
Ambient air monitoring program memo for 130 Liberty Street deconstruction project.
Similar indexed content
Chain-of-custody for 130 Liberty Street Deconstruction project, Sept 2005.
Similar indexed content
Amb monitoring plan for 130 Liberty Street deconstruction; LMDC involvement, Sept 2005.
Similar indexed content