Section 2 - Ambient Air Monitoring Program Revision No.: 0
130 Liberty Street Deconstruction Plan Date: September 7, 2005
Lower Manhattan Development Corporation
10.0 QUALITY ASSURANCE/QUALITY CONTROL
10.1 Overview
The program described herein will be performed by LMDC’s Environmental Consultant. The
Environmental Consultant will assume responsibility for the collection and analyses of all
samples identified previously in Sections 5 and 6 of this plan. The Environmental Consultant
will assume responsibility for the quality of all data to be collected in the conduct of the
deconstruction project. This role will include all QA/QC measures to be implemented to further
insure that all monitoring data meet predetermined data quality goals and objectives. A separate
document or Quality Assurance Project Plan (QAPP) is being submitted contemporaneously
herewith and is incorporated herein by this reference.
10.2 Quality Assurance/Quality Control
The Environmental Consultant will have primary responsibility for implementation of all
program Quality Control measures identified in the QAPP. These will include but not be limited
to the following types of QA/QC features:
• Data Quality Objectives
• Detection Limit Goals
• Data Capture Goals
• Chain of Custody
• Calibration Procedures and Erequencies
• Eield/Trip Blanks
• Lab Blanks
• Collocated Samples
• Matrix Spikes
• Lab Control Spikes
• Lab Method Blanks
• Eield Surrogate Spikes
• Lab Surrogate Spikes
• Corrective Action Measures
Elements of QA/QC contained in the QAPP are listed in Table 7.