Airtek Project 05-0701 - November 4, 2005
• In the event that dust levels exceed target and trigger action levels, building
deconstruction management personnel will be immediately notified so that all
necessary corrective actions can be taken.
• Monitor PMio and PM2.5 on a time-weighted or 24-hour average basis to provide
assurances that levels of respirable particulate matter associated with the
deconstruction are below the 24 hour National Ambient Air Quality Standards
(NAAQS) of 150 ug/m3 and 65 ug/m3, respectively.
• Collect particulate matter on a time-weighted or integrated basis such that
samples are available for monitoring of target compounds potentially associated
with World Trade Center dust (e.g., asbestos, lead).
• Compare measured concentrations of project target parameters to action levels
established on a compound-specific basis. In the event that measured
concentrations exceed any project specific action level for one or more of these
target compounds, appropriate corrective actions immediately will be taken. A
project timeline is provided as Figure 6-2.
• Collect waste stream samples for RCRA analyses in support of the Waste
Management Plan (WMP) to characterize, manage, containerize, and legally
transport and dispose of waste streams that will be generated as part of the 133-
135 Greenwich Street/21-23 Thames Street Deconstruction Project.
6.3 Project Action Levels
A two-tiered system will be in place during the entire term of the deconstruction project.
This system includes use of both Target Air Quality Levels and USEPA Site Specific
Trigger Levels for each of the target parameters. A summary listing of the Action Levels
provided on a parameter-specific basis is shown in Tabic 6-3.
6.3.1 Decisions Based on Project Action Levels The following actions will be taken if
there is an exceedance of any Target Air Quality Level. If there is an exceedance of both
the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated
with the USEPA Site Specific Trigger Level will govern. In the event that the
deconstruction project is shut down on account of an exceedance of an air quality
action level, monitoring for all parameters will continue. The purpose of the continuation
of monitoring will be to demonstrate that concentrations have been restored to acceptable
levels.
6.3.2 Target Air Quality Levels 6.3.2.] Definitions of Exceedances Any 24-hour PM2.5
and PMio value in excess of the Target Air Quality Level will be considered an
“exceedance” and the actions described below will be taken. During the first week of
sampling, any sample of an analyte, other than PM2.5 and PMio, in excess of 3 times the
Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific
Trigger Level, will be considered an exceedance and the actions described below will be
taken. Pollowing the first week of sampling, a rolling average will be established based
initially on the first week’s results, to which will be added daily values as results are
received from the laboratory. A rolling average value for any analyte other than PM2.5 and
20