Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - November 4, 2005
cleaning of exterior surfaces of the Building (i.c. building washdown). The proposed
cleanup and abatement will be conducted so that the Building can be safely deconstructed
in compliance with applicable law to allow for redevelopment of the Site. Following
Asbestos and COPC Abatement and Removal Phase deconstruction and removal of the
remaining “clean” building components including the clean exterior brick walls, roofs,
and structural wood components will be carried out. The deconstruction of the building at
133-135 Greenwich Street and 21-23 Thames Street is expected to consist generally of:
(a) cleaning and preparation of the building for deconstruction; (b) deconstructing the
building; (c) undertaking environmental monitoring during the deconstruction; (d)
transporting and disposing of all waste and debris from the building; and (e) backfilling,
grading and paving the Site as appropriate following the cleaning and deconstruction.
Regulatory Oversight The The Greenwich Street Project, LLC is the owner of 133-135
Greenwich Street and 21-23 Thames Street and is fully responsible for the cleaning
and deconstruction of the building and will comply with all Federal, State and City
regulations pertaining to environmental protection, asbestos abatement, hazardous
material disposal and construction. The Greenwich Street Project, LLC released the draft
deconstruction plan documents including Health and Safety Plan, Community Monitoring
Plan, and Waste Characterization Plan and Quality Assurance Project Plan in September,
2005 and formally submitted the plans for review to the following agencies:
• United States Environmental Protection Agency
• United States Occupational Safety and Health Administration (OSHA)
• New York State Department of Environmental Conservation (NYSDEC)
• New York City Department of Environmental Protection (NYCDEP)
• New York City Department of Buildings
• New York State Department of Transportation
• New York City Department of Transportation
• New York City Office of Emergency Management - Fire Department of New York -
New York Police Department - New’ York City Department of Health and Mental
The Greenwich Street Project, LLC received comments from regulatory agencies in
September, 2005 and amended the draft deconstruction plan documents.
6.2 Project Purpose and Objectives
The principal purpose of the air monitoring program, as described in The document
entitled Part II - Environmental Community Air Monitoring Plan During Abatement and
Demolition of 133-135 Greenwich Street and 21-23 Thames Street, is to monitor air
quality in the vicinity of 133-135 Greenwich Street and 21-23 Thames Street during the
deconstruction of the building on that property. The plan consists of monitoring of dust in
the vicinity of the deconstruction site on both a real-time or continuous basis as well as a
time-weighted or integrated basis. Principal objectives of the program are as follows:
• Monitor dusts as PMio and PM2.5 on a real-time or continuous basis such that dust
associated with the building deconstruction are maintained below target and
trigger action levels.
19