NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 129 pages

Environmental Community Air Monitoring Plan, Greenwich

Machine-extracted title · confidence 54%

CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.

NYC-WTC_000427716–000427844
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

• In the event that dust levels exceed target and trigger action levels, building deconstruction management personnel will be immediately notified so that all necessary corrective actions can be taken. • Monitor PMio and PM2.5 on a time-weighted or 24-hour average basis to provide assurances that levels of respirable particulate matter associated with the deconstruction are below the 24 hour National Ambient Air Quality Standards (NAAQS) of 150 ug/m3 and 65 ug/m3, respectively. • Collect particulate matter on a time-weighted or integrated basis such that samples are available for monitoring of target compounds potentially associated with World Trade Center dust (e.g., asbestos, lead). • Compare measured concentrations of project target parameters to action levels established on a compound-specific basis. In the event that measured concentrations exceed any project specific action level for one or more of these target compounds, appropriate corrective actions immediately will be taken. A project timeline is provided as Figure 6-2. • Collect waste stream samples for RCRA analyses in support of the Waste Management Plan (WMP) to characterize, manage, containerize, and legally transport and dispose of waste streams that will be generated as part of the 133- 135 Greenwich Street/21-23 Thames Street Deconstruction Project.

6.3 Project Action Levels

A two-tiered system will be in place during the entire term of the deconstruction project. This system includes use of both Target Air Quality Levels and USEPA Site Specific Trigger Levels for each of the target parameters. A summary listing of the Action Levels provided on a parameter-specific basis is shown in Tabic 6-3.

6.3.1 Decisions Based on Project Action Levels The following actions will be taken if there is an exceedance of any Target Air Quality Level. If there is an exceedance of both the Target Air Quality Level and USEPA Site Specific Trigger Level, actions associated with the USEPA Site Specific Trigger Level will govern. In the event that the deconstruction project is shut down on account of an exceedance of an air quality action level, monitoring for all parameters will continue. The purpose of the continuation of monitoring will be to demonstrate that concentrations have been restored to acceptable levels.

6.3.2 Target Air Quality Levels 6.3.2.] Definitions of Exceedances Any 24-hour PM2.5 and PMio value in excess of the Target Air Quality Level will be considered an “exceedance” and the actions described below will be taken. During the first week of sampling, any sample of an analyte, other than PM2.5 and PMio, in excess of 3 times the Target Air Quality level for that analyte, unless superseded by a USEPA Site Specific Trigger Level, will be considered an exceedance and the actions described below will be taken. Pollowing the first week of sampling, a rolling average will be established based initially on the first week’s results, to which will be added daily values as results are received from the laboratory. A rolling average value for any analyte other than PM2.5 and

20

CITY_DEP_WORBY_CANNATA_SUBP_0001 01051

NYC-WTC_000427735

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000427735Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000426348

Plan document outlining community air monitoring for Greenwich and Thames sites.

Similar indexed content

NYC-WTC_000424323

Plan title and approval sheet for environmental air monitoring, Greenwich/Thames.

Similar indexed content

NYC-WTC_000423504

Plan document for environmental community air monitoring at Greenwich Street and 21-23 Thames Street, Nov 2005.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

Compare copies and versions →