Daily work force report, World Trade, Dec 2001

Machine-extracted title · confidence 42%

Daily workforce and equipment counts for Grace Contracting at World Trade Center site, Dec 18, 2001.

NYC-WTC_000419323
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document •4

GRACE CONTRACTING CORP. ISMSfittlRoad, Whitestone, N.Y. it357-(718)767-9000 DATE: DECEMBER 18.2001 (DAY) FINAL

Job Nams & Location: World Trade Center Contract No. DAILY WORK FORCE REPORT

1 Weather Conditions

Labor ][ Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER i PROJECT ENGINEER 2 ■ CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 7 LABORERS 23 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER 1 LOCAL 15 8 IIhITACHI 1200 GRAPPLE^ 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: AWISCO HIGH DECK TRAILERS AUSTER RUBBER WELDING TRUCK 1 BLACK BEAR FUEL TRUCK 1 GRACE ASPHALT 193.30 TONS PICKUP TRUCKS S LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS •NOTE* 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 lUGHT TOWERS USED FOR 3 HOURS RAINMAKER/GENIE LIFT 1

Description of Work: DELAYS: 12:30- 2:15 OUT OF HOLE FOR PULLING OF BUILDING ____________________________ DELAYS: HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 4 2_________________ MANNED TARPING AND TRIMMING STATIONS_____________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY

GRAC^CONTRACTINGCORP ^Approved By: --------- BY: I ^^cr: SUPERIttrefTOEW-''^—

<01.303508 _________ _ DAILY WORK FORCE REPORT 1218D.xls

CITY_21MC100_006800187

NYC-WTC_000419323

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419323Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →