NYC-WTC_000269201OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. ISMS 691 Road, Whitestone, N.Y. 11357-pt8) 767-9000 DATE: DECEMBER 18. 2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER i FOREMEN___________ 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375 GRAPPLER 1 LABORERS___________ 23 ■ HITACHI 750 GRAPPLER 1 IRON WORKERS 1 ■ HITACHI 550 GRAPPLER 1 LOCAL 14 6 ■ HITACHI 550 GRAPPLER 1 LOCAL 15_________ 8 ■ HITACHI 1200 GRAPPLER 1 CARPENTER_______ ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS_________ . 1 IlMECHANICS TRUCK ~ 2 MECHANICS_________ 2 ■ TOOL TRUCK HOUSE WRECKERS 7 ■ TOOL VAN 1 ■ ROLL OFF ■ DUMP TRAILERS ■ LOW BED TRAILER DELIVERIES: AWISCO ■ HIGH DECK TRAILERS AUSTER RUBBER ■ WELDING TRUCK 1 BLACK BEAR ■ FUEL TRUCK 1 GRACE ASPHALT 193.30 TONS ■ PICKUP TRUCKS 8 BLIGHT TOWERS ~ 13 IISITE MULE 3 1 DUMP TRUCKS •NOTE* 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 LIGHT TOWERS USED FOR 3 HOURS RAINMAKER/GENIE LIFT 1
Description of Work:____________________________________________________________________ DELAYS: 12:30- 2:15 OUT OF HOLE FOR PULLING OF BUILDING 1(6____________________________ DELAYS: HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 & 2_________________ MANNED TARPING AND TRIMMING STATIONS_____________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA____________________________ ____________ MANNED WATERING STATIONS FOR DUST CONTROL___________ ___________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY
GRACE CONTRACTING CORP Approved By: Title: BY: For SUPERIMTHTO
DAILY WORK FORCE REPORT 1218D.X18
s. CITY_21MC100_005018962
NYC-WTC_000269201
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302466
Night preliminary daily workforce and equipment for World Trade site, Dec 20, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388406
Tuesday day final workforce report listing crews and machines.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305199
Final daily workforce report for World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302474
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388381
Day shift daily workforce at World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388370
Night shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305200
Night preliminary daily workforce at World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302466
Night preliminary daily workforce and equipment for World Trade site, Dec 20, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000280111
Day shift daily workforce and equipment for World Trade site, Dec 18, 2001.
Similar indexed content
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
Similar indexed content
NYC-WTC_000302466
Night preliminary daily workforce and equipment for World Trade site, Dec 20, 2001.
Similar indexed content
NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similar indexed content
NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
Similar indexed content