GRACE CONTRACTING CORP. 15M5 6th Road, Whitestone, N.Y. 11357-(718) 767.9000 DATE: DECEMBER 18,2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLEi SUPERINTENDENT 1 ■ CAT 966 LOADER 1 PROJECT ENGINEER 2 ' CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN___________ 1 ■ CAT365GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375 GRAPPLER I1 mJ- LABORERS__________ 23 ■ HITACHI 750 GRAPPLER IRON WORKERS 1 ■ HITACHI 550 GRAPPLER 1 LOCAL 14 6 ■ HITACHI 550 GRAPPLER 1 LOCAL 15 8 ' HITACH11200 GRAPPLER 1 CARPENTER * 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ MECHANICS TRUCK 2 MECHANICS 2 ■ TOOL TRUCK HOUSE WRECKERS 7 ' TOOL VAN 1 ' ROLL OFF ' DUMP TRAILERS ■ LOW BED TRAILER DELIVERS: AWISCO ■ HIGH DECK TRAILERS AUSTER RUBBER WELDING TRUCK 1 BLACK BEAR FUEL TRUCK 1 GRACE ASPHALT 193.30 TONS PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS ‘NOTE* 3 DUMP TRAILERS RAN STONE TO FIX ROADWAY 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 LIGHT TOWERS USED FOR 3 HOURS RAINMAKER/GENIE LIFT 1
Description of Work:____________________________________________________________________ DELAYS: 12:30- 2:15 OUT OF HOL^ FOR PULLING OF BUILDING #g____________________________ DELAYS: HIGH BEDS DOWN TILL 2:30 TO FIX ROADWAY INSIDE TOWERS 1 A 2_________________ MANNED TARPING AND TRIMMING STATIONS_____________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL______________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND EAST OF CHILLER PLANT LOADS OUT SEE SUMMARY
GRACE CONTRACTING CORP Approved By: Title:_______ BY: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1218D.xls
CITY_21MC100_004484410
NYC-WTC_000280111
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269201
Day final, World Trade Center daily workforce and equipment summary.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388381
Day shift daily workforce at World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305199
Final daily workforce report for World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302474
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305592
Daily workforce and equipment listing for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305220
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388390
Day shift final daily workforce at World Trade Center, Dec 17, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302509
Night final daily workforce report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269201
Day final, World Trade Center daily workforce and equipment summary.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388381
Day shift daily workforce at World Trade Center, Dec 12, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305199
Final daily workforce report for World Trade Center, December 12, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305535
Day final daily workforce report listing crews and equipment for World Trade project.
Similar indexed content
NYC-WTC_000407942
Final daily workforce and equipment listing for World Trade Center construction site, Dec 18, 2001.
Similar indexed content
NYC-WTC_000269201
Day final, World Trade Center daily workforce and equipment summary.
Similar indexed content
NYC-WTC_000388381
Day shift daily workforce at World Trade Center, Dec 12, 2001.
Similar indexed content
NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
Similar indexed content