Daily work force report, World Trade Center, Jan 2002

Machine-extracted title · confidence 44%

Day final daily workforce report listing crews and machinery for World Trade Center project.

NYC-WTC_000419298
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GF5ACE CONTRACTING CORP. l5l-<;5 6trtRoad. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/16/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Canter Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. 1| Description MANNED STANDBY IDLE SUPERINTENDENT 1 ■ CAT 966 LOADER 1 PROJECT ENGINEER 2 ■ CAT 446 BACKHOE OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375 GRAPPLER 1 LABORERS 11 ■ CAT 375 BUCKET 1 IRON WORKERS ■ HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: GRACE ASPHALT 70 CUBIC YARDS 3/4 STONE HIGH DECK TRAILERS ALL LOCK AND GLASS CO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK ■LIGHT TOWERS USED FOR 2 HOURS FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 •NOTE TRUCK 66 RAN 2 LOADS OF STONE FROM PUMP 2 WHITESTONE-TO THE SITE RAINMAKER/GENIE LIFT

Description of Work:________________________________________________________________________________ DELAYS.- GRACE 750,375G,1200 GATEWAY 550G & MAZZOCH1 1200 FROM 7AM- 11AM DUE TO__________________ PREPARING RAMP AT SLURRY WALL TO ENABLE MACHINES CROSSING INTO PIT FROM WEST SIDE HIGHWAY GATEWAY 550G DELAYED 1PM- 4PM WITH RECOVERY AT AMEC ROAD GRACE 1200 DELAYED 1PM-2:15PM DUE TO YONKERS BURNERS BURNING CANDLESTICKS THAT WERE NOT AUTHORIZED TO BURN IN THAT AREA CONTINUED REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER 1 TO ACCOMMODATE NEW BRIDGE._________________________________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL___________________________________________________ MAINTAINED TRAFFIC INTO AND OUT OF AREA________________________________________________________ LOADS OUT: 33__________________________________________________________________________________ EUKESOUT: 132

GRACE CONTRACTING CORP Approved By: Title: For: . SUPERINTENDENT

01.601109 DAILY WORK FORCE REPORT0116D.xls

CITY_21MC100_0 04163448

NYC-WTC_000419298

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419298Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →