Daily work force report, World Trade, Jan 2002 (Night)

Machine-extracted title · confidence 42%

Night shift daily workforce and equipment details for World Trade site on 1/22/02.

NYC-WTC_000429402
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.456th Road. Whitestone, N.Y. 11357.(718)767-9000 DATE: 1/22/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description I MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 973 LOADER 1 OFFICE ENGINEER CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 9 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 1200 GRAPPLER 1 LOCAL 15 6 185 CFM COMPRESSOR 1 CARPENTER 235 HAMMER HOE RAM ‘MANNED BY TULLY CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS (FUEL) 1 TOOL TRUCK MECHANICS 1 TOOL VAN HOUSE WRECKERS 2 ROLL OFF DUMP TRAILERS 8 YUKES 4 HIGH DECK TRAILERS 2 WELDING TRUCK DELIVERIES; FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 SITE MULE 2 •NOTE: WTC TRUCKING 14 DRIVERS DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 DEUKYS: TRUCK 62 WAS DELAYED FOR 2.5 HOURS CARGO BOXES 4 DUE TO BRAKE PROBLEMS FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT *235 MANNED BY TULLY FROM 5PM-12AM

Description of Work:_________________________________________________________ COMPLETED WORK____________________________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMODATE BRIDGE MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA______________________________________________ TRUCKS TO PIER 6 DELAYED APPROXIMATELY 1 HOUR BY DOT AND ConEd WORK ON TUNNEL AND ROAD LOADS OUT: 117______________________________________________________________________________ YUKESOUT: 120

GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0122N.xls Q2.2147G3

CITY_21MC100_001046858 NYC-WTC_000429402

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429402Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →