NYC-WTC_000263632
Night shift daily workforce and equipment at World Trade site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
NYC-WTC_000237668
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-15 6lh Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 1/22?02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor ____________ Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 973 LOADER 1 OFFICE ENGINEER CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS g HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 1200 GRAPPLER 1 LOCAL 15 6 185 CFM COMPRESSOR 1 CARPENTER 235 HAMMER HOE RAM •MANNED BY TULLY CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS (FUEL) 1 TOOL TRUCK MECHANICS 1 TOOL VAN HOUSE WRECKERS 2 ROLL OFF DUMP TRAILERS 8 YUKES 4 HIGH DECK TRAILERS 2 WELDING TRUCK DELIVERIES: FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 SITE MULE 2 I’NOTE: WTC TRUCKING 14 DRIVERS DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 DELAYS: TRUCK 62 WAS DELAYED FOR 2.5 HOURS CARGO BOXES 4 DUE TO BRAKE PROBLEMS FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT *235 MANNED BY TULLY FROM 5PM-12AM
Description of Work:___________________________________________________________________________________ COMPLETED WORK CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO TO ACCOMODATE BRIDGE MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA__________________________________________________ TRUCKS TO PIER 6 DELAYED APPROXIMATELY 1 HOUR BY DOT AND ConEd WORK ON TUNNEL AND ROAD LOADS OUT: 117 YUKESOUT: 120
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0122N.xls
CONF I DENTIEIIY,_2 IMC1 0 0_0 0 3 416 0 4 2
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000237668
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000263632
Night shift daily workforce and equipment at World Trade site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429402
Night shift daily workforce and equipment details for World Trade site on 1/22/02.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342308
Night final daily workforce and equipment, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419059
Night shift daily workforce report for World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356485
Night final daily workforce report for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306047
Daily workforce report listing labor classifications and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237670
Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342309
Day final workforce and equipment for World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356560
Daily labor/equipment roster for World Trade site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278701
Night final staffing and equipment counts for World Trade, Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429401
Day shift daily workforce and equipment details for World Trade site on 1/22/02.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263633
Day shift daily workforce and equipment at World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000263632
Night shift daily workforce and equipment at World Trade site, Jan 22, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429402
Night shift daily workforce and equipment details for World Trade site on 1/22/02.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342308
Night final daily workforce and equipment, Jan 22, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419059
Night shift daily workforce report for World Trade Center project.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356485
Night final daily workforce report for World Trade Center construction.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306047
Daily workforce report listing labor classifications and equipment at World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000263632
Night shift daily workforce and equipment at World Trade site, Jan 22, 2002.
Similar indexed content
NYC-WTC_000429402
Night shift daily workforce and equipment details for World Trade site on 1/22/02.
Similar indexed content
NYC-WTC_000342308
Night final daily workforce and equipment, Jan 22, 2002.
Similar indexed content
NYC-WTC_000419059
Night shift daily workforce report for World Trade Center project.
Similar indexed content
NYC-WTC_000356485
Night final daily workforce report for World Trade Center construction.
Similar indexed content