Daily work force report, World Trade, Feb 2002

Machine-extracted title · confidence 40%

Night preliminary daily workforce at World Trade on 2/3/02.

NYC-WTC_000419175
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 1S1-4S 601 Road. iVbhBSton*, N.Y. 113S7- (718) 797.^000 DATE: 2/3/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions:

Labor Equipment CLASSIFICATION QUANT. Description SUPERINTENDENT ICAT 066 LOADER PROJECT ENGINEER 1 CAT 36S GRAPPLER 1 OFFICE ENGINEER |CAT 375 GRAPPLER 1 1 FOREMEN 2 HITACHI 750 GRAPPLER SAFETY OFFICER HITACH11200 GRAPPLER 1 LABORERS 12 |l 05 CFM COMPRESSOR SEE NOTE’ IRON WORKERS IS HAMMER HOE RAM 1 LOCAL 14 4 [MECHANICS TRUCK 1 LOCAL 15 s’ -JLTRUCK ■

CARPENTER OOL VAN CARPENTER FOREMAN lOLLOFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 [DUMP TRAILERS TEAMSTERS (FLATBEDS. DUMPS, AND EUKES) 14 EUKES A MECHANICS 1 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK 1FUEL TRUCK 1 ■ PICKUP TRUCKS . 3 ■ LIGHT TOWERS 5 DELIVERIES: _________________________ /SITE MULE ~ 3 -COMPRESSOR RAN DURING SHIFT UNMANNED* I DUMP TRUCKS '|1O WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD ■ OFFICE TRAILER/GENER, 1 ■ CARGO BOXES 4 ■ FLAT TRUCK 1 ■ PUMP 2

II ■i 9K

Dascription ol Work:_______________ ■ ■ ________________________________________________ COMPLETED WORK____________________ _ ________________________________________ _____ CONTINUEO'TO remove'debris from lower LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA recorded times and numbers OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT: 101__________ _____ _________ ___________ _ __________________________________ YUKES; 166 DOT LOADS: 93___________________________________________________________________________________ DFI AYS: RECOVERY IN TOWER 1 SLOWED PRODUCTION DURING FIRST 3 HOURS: 1200 LOST 1 HR 0200-0300

GRACE CONTRACTING CORP Approved By: BY: Title:_______ I SUPERINTENCENT For: 01.608193 DAILY WORK FORCE REPORT02C3N.xls

CITY_2IMCl00_001074881 NYC-WTC_000419175

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419175Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →