NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Dec 2001

Machine-extracted title · confidence 32%

Night preliminary daily workforce report for World Trade site, Dec 12, 2001.

NYC-WTC_000388451
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-4S6»hRo«l. WWtMtone, N.Y. IISW-(718)767-9000 DATE: DECEMBER 12. 2001 (NIGHT PRELIMINARY)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN____________ 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOLTRUCK 1 HOUSE WRECKERS 12 TOOL VAN ROLLOFF DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 ■ DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:__________ _ ______________________________________________ PREUMiNARY/ANTICIPATED WORK____________________________________________ LOAD OUT STEEL AND DEBRIS________________________________________________ MAN TARPING AND TRIMMING STATIONS_______________________________________ MAN WATER STATIONS FOR DUST CONTROL___________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS_____________________________________________ ELEWTQNS: ALL MACHINES LEVEL 8-5 253

GRACE CONTRACTING CORP Approved By: Title: For: ” SUPERWfBTOBNT'^

DAILY WORK FORCE REPORT 1212N.xls

CITY_21MC100_003715471

NYC-WTC_000388451

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388451Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280005

Night shift labor and machinery at World Trade Center, December 4, 2001.

Similar indexed content

Compare copies and versions →