Daily work force report, World Trade, Feb 2002

Machine-extracted title · confidence 28%

Night shift workforce and equipment at World Trade; Feb 3, 2002.

NYC-WTC_000305091
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. l5l-4S5<IlRoaO. WhkBWme. N.Y. 11357.(718)787.9000 DATE: 2/3/02 NIGHT FINAL

DAILY WORK FORCE REPORT

iJob Name & Location: World Trade Center Contract No. Weather Conditions; ___ IftJg -1 - —

Labor ir Equipment CLASSIFICATION . QUANT. Description ,MANNED STANDBY IDLE SUPERINTENDENT ■ CAT 966 LOADER 1 PROJECT ENGINEER 1 ' CAT 366 GRAPPLER 1 OFFICE ENGINEER_______ _________________ ■ CAT 375 GRAPPLER 1 1 FOREMEN 2 ■ HITACHI 750 GRAPPLER 1 SAFETY OFFICER ■ HITACHI 1200 GRAPPLER 1 LABORERS________ 12 ■ 165 CFM COMPRESSOR SEE NOTE’ IRON WORKERS ■ 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 1 1 LOCAL 15 6 TOOL TRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP trailers 8 TEAMSTERS (FLATBEDS, DUMPS. AND EUKES) 14 EUKES 4 MECHANICS 1 HIGH DECK TRAILERS 2 HOUSE wreckers WELDING TRUCK HfUELTRUCK 1 iIpICKUP TRUCKS . ~ 3 I LIGHT TOWERS " 5 DELIVERIES: SITE MULE 3 ’COMPRESSOR RAN DURING SHIFT UNMANNED’ DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

3DK Description o/ Work:_____________ ________ ;____________ ____________________________________ COMPLETED WORK____________ -<"' _________ ___________________________________ _ CONTINUED TO REMOVE' DEBRIS FROM LOWER LEVELS'OF WTC COMPLEX, MACHINES AT EL. B6 maintained traffic flow into and out of area RECORDED TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT: 101 ____________________________ _ ________________________________ YUKES; 168 DOT LOADS: 93_____________________ ________________________ ____________________________________ delays' RECQV^Y in tower 1 SLOWED PRODUCTION DURING FIRST 3 HOURS; 1200 LOST 1HR 0200-0300

GRACE contracting CORP Approved By: BY: Title:______ ’For: SUPERirrrENOENT I t

DAILY WORK FORCE REPORT0203N.xls

CITY_21MC100_004325495

NYC-WTC_000305091

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305091Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →