Daily work force report, World Trade, Feb 2002

Machine-extracted title · confidence 38%

Final daily workforce roster for 2/27/02 at World Trade project.

NYC-WTC_000419169
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. i!i.«5 6!nRoaa. WWtestona, N.Y. 11357-(7i8)7s7-sow DATE; 271/02 DAY FINAL

DAILY WORK FORCE REPORT ■

Job Name & Location; World Trade Center Contract No. Weather Conditions: COOL AND RAINY =ac Labor “II ______ Equipment CLASSIFICATION QUANT. _______ Deocription_____ SUPERINTENDENT 1 CAT 366 LOADER PROJECT ENGINEER 2 CAT 365 GRAPPLER 1 OFFICE ENGINEER_________________________ CAT 375 GRAPPLER 2 FOREMEN 1- HITACHI 750 GRAPPLER 1 SAFETY OFFICER__________________________ 1 HITACHI 1200 GRAPPLER 1 LABORERS 9 165 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ■ ROLL OFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 ■ DUMP TRAILERS s TEAMSTERS (FLATBEDS. DUMPS. AND EUKES) 14 ■ LOW BED TRAILER MECHANICS 2 ■ HIGH DECK TRAILERS 3 HOUSE WRECKERS ■ WELDING TRUCK 1 ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 5 DELIVERIES: ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK •NOTE: TRUCK 73 RAN FOR KOCH FROM 7:00 PM TO 10:00 PMi FLASHING ARROW BOARD 1 AND FROM 2:00 PM TO 6:00 PM ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 4 DELAYS: TRUCK 62 (GPS) & TRUCK 64 TWICE WITH GPS ■ FLAT TRUCK 1 _______ PROBLEMS. TOTAL TIME LOST WAS ABOUT 4 HRS. ' PUMP 2 TRUCKS GENERALLY RUNNING SLOW

light towers used for 2.5 HOURS

HB Description of Work: COMPLETED WORK_______________________________________________ ___________________ continue removing DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT: 83 YUKES: 136 DOT LOADS: 128 01.607387 GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0201D.x18

CITY_2IMCl0 0_0 010 7 4 4 2 4 NYC-WTC_000419169

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419169Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →