Daily work force report, World Trade Center, Jan 2002

Machine-extracted title · confidence 40%

Nightly workforce and equipment roster for World Trade Center project.

NYC-WTC_000279976
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTIN O CORP. iSi.tSBinRoM. Wntosiona, N.Y. I11S7-(718|?5?-3O<M DATE: Z/1/02 DAY FINAL

DAILY WORK FORCE REPORT

IJob Name & Location; World Trade Center Contract No. Iweather Conditions: COOL AND RAINY

vac -abor f EquiprnenT “assification QUANT. Dsecription MANNED STANDBY IDLE [SUPERINTENDENT _________________ 1 CAT 068 LOADER 1 [PROJECT ENGINEER 2 CAT 365 GRAPPLER 1 [OFFICE ENGINEER ______________ _ CAT 375 GRAPPLER 2 [FOREMEN 1- HITACHI 750 GRAPPLER 1 SAFETY OFFICER_______ _ _____________ _ 1' Hl'-ACHI 1200 GRAPPLER 1 LABORERS g 18.5 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 2 LOCAL1S________________________________ 5 TOOL TRUCK 1 CARPENTER__________ ___________________ 1 TOOL VAN CARPENTER FOREMAN____________________ 1 ROLL OFF TEAMSTERS (FUEL. TRAIL ER DELIVERY) 1 DUMP TRAILERS S TEAMSTERS (FLATBEDS. DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS 2 HIGH DECK TRAILERS 3 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES:' SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK ■NOTE; TRUCK 73 RAN FO KOCH FROM 7:00 PM TO 10:00 PM FLASHING ARROW BOARD 1 AND FROM 2:00 PM TO 6:00 PM OFFICE TRAILER/GENER. 1 CARGO BOXES 4 DELAYS: TRUCK 62 (GPS) & TRUCK 64 TWICE WITH GPS FLAT TRUCK 1 PROBLEMS, total TIME LOST WAS ABOUT 4 HRS. PUMP 2 TRUCKS GENERALLY RUNNING SLOW | '

LIGHT TOWERS USED FOFt2.5 HOURS

Description of Work:______________________________________ __ _________________________ _ COMPL^bWOfiK. ______________________ _ continue removing DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA______________________ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE LOADS OUT: B3 YUKES: 130 POT LOADS: 120

GRACE CONTRACTING CORP Approved By: BY: Title: For; superintendent

DAILY WORK FORCE REPORT0201D,x!9

CITY_21MC100_004504439

NYC-WTC_000279976

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000279976Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →